17,189 research outputs found

    Research of the active reflector antenna using laser angle metrology system

    Full text link
    Active reflector is one of the key technologies for constructing large telescopes, especially for the millimeter/sub-millimeter radio telescopes. This article introduces a new efficient laser angle metrology system for the active reflector antenna of the large radio telescopes, with a plenty of active reflector experiments mainly about the detecting precisions and the maintaining of the surface shape in real time, on the 65-meter radio telescope prototype constructed by Nanjing Institute of Astronomical Optics and Technology (NIAOT). The test results indicate that the accuracy of the surface shape segmenting and maintaining is up to micron dimension, and the time-response can be of the order of minutes. Therefore, it is proved to be workable for the sub-millimeter radio telescopes.Comment: 10 pages, 15 figure

    Civil space technology initiative

    Get PDF
    The Civil Space Technology Initiative (CSTI) is a major, focused, space technology program of the Office of Aeronautics, Exploration and Technology (OAET) of NASA. The program was initiated to advance technology beyond basic research in order to expand and enhance system and vehicle capabilities for near-term missions. CSTI takes critical technologies to the point at which a user can confidently incorporate the new or expanded capabilities into relatively near-term, high-priority NASA missions. In particular, the CSTI program emphasizes technologies necessary for reliable and efficient access to and operation in Earth orbit as well as for support of scientific missions from Earth orbit

    Neutral buoyancy test evaluation of hardware and extravehicular activity procedures for on-orbit assembly of a 14 meter precision reflector

    Get PDF
    A procedure that enables astronauts in extravehicular activity (EVA) to perform efficient on-orbit assembly of large paraboloidal precision reflectors is presented. The procedure and associated hardware are verified in simulated Og (neutral buoyancy) assembly tests of a 14 m diameter precision reflector mockup. The test article represents a precision reflector having a reflective surface which is segmented into 37 individual panels. The panels are supported on a doubly curved tetrahedral truss consisting of 315 struts. The entire truss and seven reflector panels were assembled in three hours and seven minutes by two pressure-suited test subjects. The average time to attach a panel was two minutes and three seconds. These efficient assembly times were achieved because all hardware and assembly procedures were designed to be compatible with EVA assembly capabilities
    corecore