Applying multi-user technology for modeling complex cad objects
Complex CAD modelling occurring in engineering design and construction processes relies upon the effective management of teamwork where a variety of specialists work together on the development of one compound object that leads to the following issues which have to be dealt with in order to make this process time- and cost-effective: i) difficulties in exchanging technical information (including drawings) due to modifications in the CAD model; ii) difficulties in tracking modifications performed by other project participants; iii) difficulties in working with elements connected to another element already used by other participants; iv) assessment of various object versions. To facilitate these processes and manage the flow of technical information between project partners, multi-user technology is considered. It operates with a complex CAD object in the same way as an electronic archive system in engineering document management systems and offers a level of control over the information flow within the construction process.
„Multi-user“ technologijos taikymas kompleksiniams statiniams projektuoti
Santrauka
Modeliuojant didelius kompleksinius statinius, efektyvus projektavimo procesas priklauso nuo komandinio darbo suderinamumo. Tiek vienos projektinės grupės projektuotojai, tiek atskirų projektinių dalių inžineriai, dirbantys prie vieno didelio objekto, susiduria su tokiomis problemomis: 1) dėl CAD modelyje vysktančių pasikeitimų techninės dokumentacijos (brėžinių) apsikeitimo procesas tarp atskirų projektavimo grandžių yra sudėtingas; 2) projekto dalyvio ivesti taisymai laiku nerodo pasikeitimų; 3) sunku efektyviai projektuoti, jei vienas bendras konstrukcinis elementas arba objektas naudojamas atskirų projektuotojų; 4) versijų sekimas. Šio darbo tikslas – pateikti naujausią “multi-user” technologiją, kuri leidžia valdyti projektavimo procesą tarp projekto dalyvių, vykdant kompleksinių statinių CAD modeliavimą.
First Published Online: 16 May 2013
Reikšminiai žodžiai: automatizuoto projektavimo sistemos, techninės dokumentacijos valdymas, “multi-user” technologij
Recommended from our members
Requirements for building information modeling based lean production management systems for construction
Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last
Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face
Building information model - avaliação do seu potencial como solução para os principais atrasos e desperdícios na construção portuguesa
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Civil – perfil de ConstruçãoEstudos anteriores ao sector da construção revelaram a necessidade de investir na
melhoria da qualidade dos projectos e na melhoria da gestão dos empreendimentos.
A concepção desta dissertação partiu, assim, da ideia de esclarecer as causas para o
incumprimento de prazos e de custos, reunindo toda a informação necessária de forma a discutir se a implemenção do BIM – Building Information Modeling – resolveria estas situações.
Este estudo concebeu-se através de entrevistas a 10 empresas portuguesas de
construção com actividades de investigação e desenvolvimento, sobre os problemas de
incumprimento de prazos e de custos nas fases de Concurso, Preparação e Execução, na
perspectiva do Empreiteiro.
Os potenciais benefícios da metodologia BIM são o aumento do fluxo de informação, o aumento da colaboração, o aumento do controlo do planeamento e do orçamento, a redução das incompatibilidades entre projectos de especialidades, o aumento da qualidade da construção e a diminuição do risco. Assim, o BIM tem a capacidade de eliminar ou atenuar os problemas detectatos nas 3 fases.
Pretende-se que este estudo esclareça a indústria da construção relativamente aos
problemas existentes e alerte os responsáveis para a implementação de ferramentas de gestão que eliminem desperdícios (tempo e materiais) e diminuam os custos dos empreendimentos