33,643 research outputs found

    Offline and online variants of the Traveling Salesman Problem

    Get PDF
    In this thesis, we study several well-motivated variants of the Traveling Salesman Problem (TSP). First, we consider makespan minimization for vehicle scheduling problems on trees with release and handling times. 2-approximation algorithms were known for several variants of the single vehicle problem on a path. A 3/2-approximation algorithm was known for the single vehicle problem on a path where there is a fixed starting point and the vehicle must return to the starting point upon completion. Karuno, Nagamochi and Ibaraki give a 2-approximation algorithm for the single vehicle problem on trees. We develop a Polynomial Time Approximation Scheme (PTAS) for the single vehicle scheduling problem on trees which have a constant number of leaves. This PTAS can be easily adapted to accommodate various starting/ending constraints. We then extended this to a PTAS for the multiple vehicle problem where vehicles operate in disjoint subtrees. We also present competitive online algorithms for some single vehicle scheduling problems. Secondly, we study a class of problems called the Online Packet TSP Class (OP-TSP-CLASS). It is based on the online TSP with a packet of requests known and available for scheduling at any given time. We provide a 5/3 lower bound on any online algorithm for problems in OP-TSP-CLASS. We extend this result to the related k-reordering problem for which a 3/2 lower bound was known. We develop a κ+1-competitive algorithm for problems in OP-TSP-CLASS, where a κ-approximation algorithm is known for the offline version of that problem. We use this result to develop an offline m(κ+1)-approximation algorithm for the Precedence-Constrained TSP (PCTSP) by segmenting the n requests into m packets. Its running time is mf(n/m) given a κ-approximation algorithm for the offline version whose running time is f(n)

    Packing Sporadic Real-Time Tasks on Identical Multiprocessor Systems

    Get PDF
    In real-time systems, in addition to the functional correctness recurrent tasks must fulfill timing constraints to ensure the correct behavior of the system. Partitioned scheduling is widely used in real-time systems, i.e., the tasks are statically assigned onto processors while ensuring that all timing constraints are met. The decision version of the problem, which is to check whether the deadline constraints of tasks can be satisfied on a given number of identical processors, has been known NP{\cal NP}-complete in the strong sense. Several studies on this problem are based on approximations involving resource augmentation, i.e., speeding up individual processors. This paper studies another type of resource augmentation by allocating additional processors, a topic that has not been explored until recently. We provide polynomial-time algorithms and analysis, in which the approximation factors are dependent upon the input instances. Specifically, the factors are related to the maximum ratio of the period to the relative deadline of a task in the given task set. We also show that these algorithms unfortunately cannot achieve a constant approximation factor for general cases. Furthermore, we prove that the problem does not admit any asymptotic polynomial-time approximation scheme (APTAS) unless P=NP{\cal P}={\cal NP} when the task set has constrained deadlines, i.e., the relative deadline of a task is no more than the period of the task.Comment: Accepted and to appear in ISAAC 2018, Yi-Lan, Taiwa

    Algorithmic Chernoff-Hoeffding Inequalities in Integer Programming

    Get PDF
    Proofs of classical Chernoff-Hoeffding bounds have been used to obtain polynomial-time implementations of Spencer's derandomization method of conditional probabilities on usual finite machine models: given m events whose complements are large deviations corresponding to weighted sums of n mutually independent Bernoulli trials, Raghavan's lattice approximation algorithm constructs for 0-1 weights and integer deviation terms in O(mn)-time a point for which all events hold. For rational weighted sums of Bernoulli trials the lattice approximation algorithm or Spencer's hyperbolic cosine algorithm are deterministic procedures, but a polynomial-time implementation was not known. We resolve this problem with an O(mn^2log frac{mn}{epsilon})-time algorithm, whenever the probability that all events hold is at least epsilon > 0. Since such algorithms simulate the proof of the underlying large deviation inequality in a constructive way, we call it the algorithmic version of the inequality. Applications to general packing integer programs and resource constrained scheduling result in tight and polynomial-time approximations algorithms

    A bi-objective genetic algorithm approach to risk mitigation in project scheduling

    Get PDF
    A problem of risk mitigation in project scheduling is formulated as a bi-objective optimization problem, where the expected makespan and the expected total cost are both to be minimized. The expected total cost is the sum of four cost components: overhead cost, activity execution cost, cost of reducing risks and penalty cost for tardiness. Risks for activities are predefined. For each risk at an activity, various levels are defined, which correspond to the results of different preventive measures. Only those risks with a probable impact on the duration of the related activity are considered here. Impacts of risks are not only accounted for through the expected makespan but are also translated into cost and thus have an impact on the expected total cost. An MIP model and a heuristic solution approach based on genetic algorithms (GAs) is proposed. The experiments conducted indicate that GAs provide a fast and effective solution approach to the problem. For smaller problems, the results obtained by the GA are very good. For larger problems, there is room for improvement

    Flow-time Optimization for Concurrent Open-Shop and Precedence Constrained Scheduling Models

    Get PDF
    Scheduling a set of jobs over a collection of machines is a fundamental problem that needs to be solved millions of times a day in various computing platforms: in operating systems, in large data clusters, and in data centers. Along with makespan, flow-time, which measures the length of time a job spends in a system before it completes, is arguably the most important metric to measure the performance of a scheduling algorithm. In recent years, there has been a remarkable progress in understanding flow-time based objective functions in diverse settings such as unrelated machines scheduling, broadcast scheduling, multi-dimensional scheduling, to name a few. Yet, our understanding of the flow-time objective is limited mostly to the scenarios where jobs have no dependencies. On the other hand, in almost all real world applications, think of MapReduce settings for example, jobs have dependencies that need to be respected while making scheduling decisions. In this paper, we take first steps towards understanding this complex problem. In particular, we consider two classical scheduling problems that capture dependencies across jobs: 1) concurrent open-shop scheduling (COSSP) and 2) precedence constrained scheduling. Our main motivation to study these problems specifically comes from their relevance to two scheduling problems that have gained importance in the context of data centers: co-flow scheduling and DAG scheduling. We design almost optimal approximation algorithms for COSSP and PCSP, and show hardness results
    corecore