14,657 research outputs found

    SRAT-Distribution Voltage Sags and Reliability Assessment Tool

    Get PDF
    Interruptions to supply and sags of distribution system voltage are the main aspects causing customer complaints. There is a need for analysis of supply reliability and voltage sag to relate system performance with network structure and equipment design parameters. This analysis can also give prediction of voltage dips, as well as relating traditional reliability and momentary outage measures to the properties of protection systems and to network impedances. Existing reliability analysis software often requires substantial training, lacks automated facilities, and suffers from data availability. Thus it requires time-consuming manual intervention for the study of large networks. A user-friendly sag and reliability assessment tool (SRAT) has been developed based on existing impedance data, protection characteristics, and a model of failure probability. The new features included in SRAT are a) efficient reliability and sag assessments for a radial network with limited loops, b) reliability evaluation associated with realistic protection and restoration schemes, c) inclusion of momentary outages in the same model as permanent outage evaluation, d) evaluation of the sag transfer through meshed subtransmission network, and e) simplified probability distribution model determined from available faults records. Examples of the application of the tools to an Australian distribution network are used to illustrate the application of this model

    AI and OR in management of operations: history and trends

    Get PDF
    The last decade has seen a considerable growth in the use of Artificial Intelligence (AI) for operations management with the aim of finding solutions to problems that are increasing in complexity and scale. This paper begins by setting the context for the survey through a historical perspective of OR and AI. An extensive survey of applications of AI techniques for operations management, covering a total of over 1200 papers published from 1995 to 2004 is then presented. The survey utilizes Elsevier's ScienceDirect database as a source. Hence, the survey may not cover all the relevant journals but includes a sufficiently wide range of publications to make it representative of the research in the field. The papers are categorized into four areas of operations management: (a) design, (b) scheduling, (c) process planning and control and (d) quality, maintenance and fault diagnosis. Each of the four areas is categorized in terms of the AI techniques used: genetic algorithms, case-based reasoning, knowledge-based systems, fuzzy logic and hybrid techniques. The trends over the last decade are identified, discussed with respect to expected trends and directions for future work suggested

    An availability study for a SME

    Get PDF
    A case study of an availability analysis for a small commercial company is presented. The analysis was carried out to meet a customer requirement for the availability of an electronic ground-based system in a benign environment. Availability calculations were based on failure data provided and an explanation of the methodology and problems encountered and dealt with are discussed. The methodology includes failure classification according to MIL-HDBK-781A and how it may be used to promote and develop internal processes. A commentary on the background to reliability/availability specification is provided and a number of recommendations for monitoring reliability and availability are given

    Advanced Techniques for Assets Maintenance Management

    Get PDF
    16th IFAC Symposium on Information Control Problems in Manufacturing INCOM 2018 Bergamo, Italy, 11–13 June 2018. Edited by Marco Macchi, László Monostori, Roberto PintoThe aim of this paper is to remark the importance of new and advanced techniques supporting decision making in different business processes for maintenance and assets management, as well as the basic need of adopting a certain management framework with a clear processes map and the corresponding IT supporting systems. Framework processes and systems will be the key fundamental enablers for success and for continuous improvement. The suggested framework will help to define and improve business policies and work procedures for the assets operation and maintenance along their life cycle. The following sections present some achievements on this focus, proposing finally possible future lines for a research agenda within this field of assets management

    Reliability assessment of microgrid with renewable generation and prioritized loads

    Full text link
    With the increase in awareness about the climate change, there has been a tremendous shift towards utilizing renewable energy sources (RES). In this regard, smart grid technologies have been presented to facilitate higher penetration of RES. Microgrids are the key components of the smart grids. Microgrids allow integration of various distributed energy resources (DER) such as the distributed generation (DGs) and energy storage systems (ESSs) into the distribution system and hence remove or delay the need for distribution expansion. One of the crucial requirements for utilities is to ensure that the system reliability is maintained with the inclusion of microgrid topology. Therefore, this paper evaluates the reliability of a microgrid containing prioritized loads and distributed RES through a hybrid analytical-simulation method. The stochasticity of RES introduces complexity to the reliability evaluation. The method takes into account the variability of RES through Monte- Carlo state sampling simulation. The results indicate the reliability enhancement of the overall system in the presence of the microgrid topology. In particular, the highest priority load has the largest improvement in the reliability indices. Furthermore, sensitivity analysis is performed to understand the effects of the failure of microgrid islanding in the case of a fault in the upstream network

    Review of recent research towards power cable life cycle management

    Get PDF
    Power cables are integral to modern urban power transmission and distribution systems. For power cable asset managers worldwide, a major challenge is how to manage effectively the expensive and vast network of cables, many of which are approaching, or have past, their design life. This study provides an in-depth review of recent research and development in cable failure analysis, condition monitoring and diagnosis, life assessment methods, fault location, and optimisation of maintenance and replacement strategies. These topics are essential to cable life cycle management (LCM), which aims to maximise the operational value of cable assets and is now being implemented in many power utility companies. The review expands on material presented at the 2015 JiCable conference and incorporates other recent publications. The review concludes that the full potential of cable condition monitoring, condition and life assessment has not fully realised. It is proposed that a combination of physics-based life modelling and statistical approaches, giving consideration to practical condition monitoring results and insulation response to in-service stress factors and short term stresses, such as water ingress, mechanical damage and imperfections left from manufacturing and installation processes, will be key to success in improved LCM of the vast amount of cable assets around the world

    A Survey on Communication Networks for Electric System Automation

    Get PDF
    Published in Computer Networks 50 (2006) 877–897, an Elsevier journal. The definitive version of this publication is available from Science Direct. Digital Object Identifier:10.1016/j.comnet.2006.01.005In today’s competitive electric utility marketplace, reliable and real-time information become the key factor for reliable delivery of power to the end-users, profitability of the electric utility and customer satisfaction. The operational and commercial demands of electric utilities require a high-performance data communication network that supports both existing functionalities and future operational requirements. In this respect, since such a communication network constitutes the core of the electric system automation applications, the design of a cost-effective and reliable network architecture is crucial. In this paper, the opportunities and challenges of a hybrid network architecture are discussed for electric system automation. More specifically, Internet based Virtual Private Networks, power line communications, satellite communications and wireless communications (wireless sensor networks, WiMAX and wireless mesh networks) are described in detail. The motivation of this paper is to provide a better understanding of the hybrid network architecture that can provide heterogeneous electric system automation application requirements. In this regard, our aim is to present a structured framework for electric utilities who plan to utilize new communication technologies for automation and hence, to make the decision making process more effective and direct.This work was supported by NEETRAC under Project #04-157

    Study on Preventive Maintenance Strategies of Filling Equipment Based on Reliability-Cantered Maintenance

    Get PDF
    In order to ensure normal operation of enterprise production activities and enhance the competitiveness of enterprise, equipment management and maintenance strategy formulation has always been one of important contents of daily management of enterprise. According to the actual requirement of a Chinese beer production enterprise, preventive maintenance strategy of filling equipment is put forward based on reliability-centred maintenance (RCM). Firstly, on the basis of analyzing RCM theory and equipment maintenance, the general process of failure analysis of beer production equipment is presented. Secondly, the general production process of bottled beer is analyzed, and the composition of major filling equipment is also introduced in the beer production line. With the help of key indicators of equipment reliability, such as mean time between failure (MTBF), mean time to repair restoration (MTTR) and availability Ai, the fault analysis of filling production line is carried out, and the relevant results are calculated. Then, process failure mode and effect analysis (PFMEA) of filling machine is implemented, and fault tree analysis (FTA) of potential failure modes with high risk priority numbers is also completed. Finally, preventive and maintenance strategies of filling equipment are established on the basis of RCM. Through the research in this paper, maintenance costs and unplanned breakdown hours can be significantly reduced
    corecore