14,000 research outputs found

    Enhanced genetic algorithm-based fuzzy multiobjective strategy to multiproduct batch plant design

    Get PDF
    This paper addresses the problem of the optimal design of batch plants with imprecise demands in product amounts. The design of such plants necessary involves how equipment may be utilized, which means that plant scheduling and production must constitute a basic part of the design problem. Rather than resorting to a traditional probabilistic approach for modeling the imprecision on product demands, this work proposes an alternative treatment by using fuzzy concepts. The design problem is tackled by introducing a new approach based on a multiobjective genetic algorithm, combined wit the fuzzy set theory for computing the objectives as fuzzy quantities. The problem takes into account simultaneous maximization of the fuzzy net present value and of two other performance criteria, i.e. the production delay/advance and a flexibility index. The delay/advance objective is computed by comparing the fuzzy production time for the products to a given fuzzy time horizon, and the flexibility index represents the additional fuzzy production that the plant would be able to produce. The multiobjective optimization provides the Pareto's front which is a set of scenarios that are helpful for guiding the decision's maker in its final choices. About the solution procedure, a genetic algorithm was implemented since it is particularly well-suited to take into account the arithmetic of fuzzy numbers. Furthermore because a genetic algorithm is working on populations of potential solutions, this type of procedure is well adapted for multiobjective optimization

    Intelligent systems in manufacturing: current developments and future prospects

    Get PDF
    Global competition and rapidly changing customer requirements are demanding increasing changes in manufacturing environments. Enterprises are required to constantly redesign their products and continuously reconfigure their manufacturing systems. Traditional approaches to manufacturing systems do not fully satisfy this new situation. Many authors have proposed that artificial intelligence will bring the flexibility and efficiency needed by manufacturing systems. This paper is a review of artificial intelligence techniques used in manufacturing systems. The paper first defines the components of a simplified intelligent manufacturing systems (IMS), the different Artificial Intelligence (AI) techniques to be considered and then shows how these AI techniques are used for the components of IMS

    Multi crteria decision making and its applications : a literature review

    Get PDF
    This paper presents current techniques used in Multi Criteria Decision Making (MCDM) and their applications. Two basic approaches for MCDM, namely Artificial Intelligence MCDM (AIMCDM) and Classical MCDM (CMCDM) are discussed and investigated. Recent articles from international journals related to MCDM are collected and analyzed to find which approach is more common than the other in MCDM. Also, which area these techniques are applied to. Those articles are appearing in journals for the year 2008 only. This paper provides evidence that currently, both AIMCDM and CMCDM are equally common in MCDM

    Partner selection in agile supply chains: A fuzzy intelligent approach

    Get PDF
    Partner selection is a fundamental issue in supply chain management as it contributes significantly to overall supply chain performance. However, such decision-making is problematic due to the need to consider both tangible and intangible factors, which cause vagueness, ambiguity and complexity. This paper proposes a new fuzzy intelligent approach for partner selection in agile supply chains by using fuzzy set theory in combination with radial basis function artificial neural network. Using these two approaches in combination enables the model to classify potential partners in the qualification phase of partner selection efficiently and effectively using very large amounts of both qualitative and quantitative data. The paper includes a worked empirical application of the model with data from 84 representative companies within the Chinese electrical components and equipment industry, to demonstrate its suitability for helping organisational decision-makers in partner selection

    Evaluation of e-learning web sites using fuzzy axiomatic design based approach

    Get PDF
    High quality web site has been generally recognized as a critical enabler to conduct online business. Numerous studies exist in the literature to measure the business performance in relation to web site quality. In this paper, an axiomatic design based approach for fuzzy group decision making is adopted to evaluate the quality of e-learning web sites. Another multi-criteria decision making technique, namely fuzzy TOPSIS, is applied in order to validate the outcome. The methodology proposed in this paper has the advantage of incorporating requirements and enabling reductions in the problem size, as compared to fuzzy TOPSIS. A case study focusing on Turkish e-learning websites is presented, and based on the empirical findings, managerial implications and recommendations for future research are offered

    Observation of temporary accommodation for construction workers according to the code of practice for temporary construction site workers amenities and accommodation (ms2593:2015) in Johor, Malaysia

    Get PDF
    The Malaysian government is currently improving the quality of workers temporary accommodation by introducing MS2593:2015 (Code of Practice for Temporary Site Workers Amenities and Accommodation) in 2015. It is in line with the initiative in the Construction Industry Transformation Programme (2016-2020) to increase the quality and well-being of construction workers in Malaysia. Thus, to gauge the current practice of temporary accommodation on complying with the particular guideline, this paper has put forth the observation of such accommodation towards elements in Section 3 within MS2593:2015. A total of seventeen (17) temporary accommodation provided by Grade 6 and Grade 7 contractors in Johor were selected and assessed. The results disclosed that most of the temporary accommodation was not complying with the guideline, where only thirteen (13) out of fifty-eight (58) elements have recorded full compliance (100%), and the lowest compliance percentage (5.9%) are discovered in the Section 3.12 (Signage). In a nutshell, given the significant gap of compliance between current practices of temporary accommodation and MS2593:2015, a holistic initiative need to be in place for the guideline to be worthwhile
    corecore