71,688 research outputs found

    A 5D Building Information Model (BIM) for Potential Cost-Benefit Housing: A Case of Kingdom of Saudi Arabia (KSA)

    Get PDF
    The Saudi construction industry is going through a process of acclimatizing to a shifting fiscal environment. Due to recent fluctuations in oil prices, the Saudi construction sector decided to adjust to current trade-market demands and rigorous constitutional regulations because of competitive pressures. This quantitative study assesses and compares existing flat design vs. mid-terrace housing through cost estimation and design criteria that takes family privacy into consideration and meets the needs of Saudi Arabian families (on average consisting of seven members). Five pilot surveys were undertaken to evaluate the property preference type of Saudi families. However, Existing models did not satisfy the medium range family needs and accordingly a 5D (3D + Time + Cost) Building Information Modelling (BIM) is proposed for cost benefiting houses. Research results revealed that mid-terrace housing was the best option, as it reduced land usage and construction costs. While, 5D BIM led to estimate accurate Bill of Quantities (BOQ) and the appraisal of construction cost

    Enhancing the employability of fashion students through the use of 3D CAD

    Get PDF
    The textile and apparel industry has one of the longest and most intricate supply chains within manufacturing. Advancement in technology has facilitated its globalisation, enabling companies to span geographical borders. This has led to new methods of communication using electronic data formats. Throughout the latter part of the 20th Century, 2D CAD technology established itself as an invaluable tool within design and product development. More recently 3D virtual simulation software has made small but significant steps within this market. The technological revolution has opened significant opportunities for those forward thinking companies that are beginning to utilise 3D software. This advanced technology requires designers with unique skill sets. This paper investigates the skills required by fashion graduates from an industry perspective. To reflect current industrial working practices, it is essential for educational establishments to incorporate technologies that will enhance the employability of graduates. This study developed an adapted action research model based on the work of Kurt Lewin, which reviewed the learning and teaching of 3D CAD within higher education. It encompassed the selection of 3D CAD software development, analysis of industry requirements, and the implementation of 3D CAD into the learning and teaching of a selection of fashion students over a three year period. Six interviews were undertaken with industrial design and product development specialists to determine: current working practices, opinions of virtual 3D software and graduate skill requirements. It was found that the companies had similar working practices independent of the software utilised within their product development process. The companies which employed 3D CAD software considered further developments were required before the technology could be fully integrated. Further to this it was concluded that it was beneficial for graduates to be furnished with knowledge of emerging technologies which reflect industry and enhance their employability skills

    On-line transformer condition monitoring through diagnostics and anomaly detection

    Get PDF
    This paper describes the end-to-end components of an on-line system for diagnostics and anomaly detection. The system provides condition monitoring capabilities for two in- service transmission transformers in the UK. These transformers are nearing the end of their design life, and it is hoped that intensive monitoring will enable them to stay in service for longer. The paper discusses the requirements on a system for interpreting data from the sensors installed on site, as well as describing the operation of specific diagnostic and anomaly detection techniques employed. The system is deployed on a substation computer, collecting and interpreting site data on-line

    Extending the palette: an analysis of the heterogeneity of techniques for communicating space

    Get PDF
    This study offers an analysis of the increasing range of communication methods required by the emerging profession of the architectural technologist. It reviews the process of introducing methods of communication into the academic curriculum of undergraduate architectural technology students who have a need to select appropriate techniques in order to communicate to various stakeholders, design teams and clients. The paper reviews the integration of three-dimensional computer modelling technologies for the analysis and communication of proposed designs and considers the knowledge and skills which will be required to enable effective representation of increasingly complex buildings

    A design-for-casting integrated approach based on rapid simulation and modulus criterion

    Get PDF
    This paper presents a new approach to the design of cast components and their associated tools. The current methodology is analysed through a case study and its main disadvantages underlined. Then, in order to overcome these identified drawbacks, a new approach is proposed. Knowing that this approach is mainly based on a rapid simulation of the process, basics of a simplified physical model of solidification are presented as well as an associated modulus criterion. Finally, technical matters for a software prototype regarding the implementation of this Rapid Simulation Approach (RSA) in a CAD environment are detailed

    JUMPSAT: Qualifying three equipments in the CubeSat mission

    Get PDF
    JUMPSAT is a 3-Unit CubeSat mission expected for launch in 2017. It is a collaborative project involving the French research institutes CNES and ONERA as well as two universities, the Institut Supérieur de l'Aéronautique et de l'Espace and TELECOM Bretagne. The main mission objectives are the technological verification of both the three-axis attitude control system as well as the verification of two embedded payloads: A low cost Star Tracker developed by ISAE-Supaero for future small satellite missions and a directional radiation sensor for precise mapping of the Earth radiation belt. This article focuses on the mission concept and the status of the mission design in fall 2013. Main mission parameters are introduced, with emphases on the characteristic properties of the Jumpsat mission, as for example the choice of a sun-synchronous elliptical low-Earth Orbit, which is necessary to be in compliance with the payload requirements and at the same time to ensure space debris prevention. Furthermore, due to the limited observation time of a polar satellite, it was decided to utilize a distributed ground station network on S-band frequency for ensuring the necessary communication bandwidth for up- and downlink. The space segment will be equipped with deployable solar panels for improving the thermal and power budget of the overall system. Finally, a brief overview of the specifications and design of the attitude control system and both payloads are also given in the article

    Design of all electric secondary power system for future advanced MALE UAV

    Get PDF
    SAvE (Systems for UAV Alternative Energy) is a research project funded in 2007 by Piemonte Regional Government, Italy, and assigned to Politecnico di Torino and Alenia Aeronautica. Aim of the project is the study of new, more efficient, more effective and more environmentally friendly on board systems for future advanced Unmanned Aerial Vehicles (UAV), particularly for future advanced MALE UAVs. The paper deals with the analysis and design of the all electric Secondary Power System of a future advanced MALE UAV, that we consider as "reference aircraft". After a thorough trade-off analysis of different configurations of the Secondary Power System, the hybrid configuration, characterized by generators (or better, starter/generators), fuel cells and traditional and innovative batteries, has been selected as the most promising. Detailed investigations to find the best way to apportion the supply of secondary power, considering the various power sources (generators or starter/generators, batteries and fuel cells) in the different modes of operations, have been performed thanks to an integrated simulation environment, where physical, functional and mission scenario simulations continuously exchange data and results

    Zero and low carbon buildings: A driver for change in working practices and the use of computer modelling and visualization

    Get PDF
    Buildings account for significant carbon dioxide emissions, both in construction and operation. Governments around the world are setting targets and legislating to reduce the carbon emissions related to the built environment. Challenges presented by increasingly rigorous standards for construction projects will mean a paradigm shift in how new buildings are designed and managed. This will lead to the need for computational modelling and visualization of buildings and their energy performance throughout the life-cycle of the building. This paper briefly outline how the UK government is planning to reduce carbon emissions for new buildings. It discusses the challenges faced by the architectural, construction and building management professions in adjusting to the proposed requirements for low or zero carbon buildings. It then outlines how software tools, including the use of visualization tools, could develop to support the designer, contractor and user

    Designing a novel virtual collaborative environment to support collaboration in design review meetings

    Get PDF
    Project review meetings are part of the project management process and are organised to assess progress and resolve any design conflicts to avoid delays in construction. One of the key challenges during a project review meeting is to bring the stakeholders together and use this time effectively to address design issues as quickly as possible. At present, current technology solutions based on BIM or CAD are information-centric and do not allow project teams to collectively explore the design from a range of perspectives and brainstorm ideas when design conflicts are encountered. This paper presents a system architecture that can be used to support multi-functional team collaboration more effectively during such design review meetings. The proposed architecture illustrates how information-centric BIM or CAD systems can be made human- and team-centric to enhance team communication and problem solving. An implementation of the proposed system architecture has been tested for its utility, likability and usefulness during design review meetings. The evaluation results suggest that the collaboration platform has the potential to enhance collaboration among multi-functional teams
    • 

    corecore