32,535 research outputs found

    Identifying common problems in the acquisition and deployment of large-scale software projects in the US and UK healthcare systems

    Get PDF
    Public and private organizations are investing increasing amounts into the development of healthcare information technology. These applications are perceived to offer numerous benefits. Software systems can improve the exchange of information between healthcare facilities. They support standardised procedures that can help to increase consistency between different service providers. Electronic patient records ensure minimum standards across the trajectory of care when patients move between different specializations. Healthcare information systems also offer economic benefits through efficiency savings; for example by providing the data that helps to identify potential bottlenecks in the provision and administration of care. However, a number of high-profile failures reveal the problems that arise when staff must cope with the loss of these applications. In particular, teams have to retrieve paper based records that often lack the detail on electronic systems. Individuals who have only used electronic information systems face particular problems in learning how to apply paper-based fallbacks. The following pages compare two different failures of Healthcare Information Systems in the UK and North America. The intention is to ensure that future initiatives to extend the integration of electronic patient records will build on the ‘lessons learned’ from previous systems

    Towards an integrated perspective on fleet asset management: engineering and governance considerations

    Get PDF
    The traditional engineering perspective on asset management concentrates on the operational performance the assets. This perspective aims at managing assets through their life-cycle, from technical specification, to acquisition, operation including maintenance, and disposal. However, the engineering perspective often takes for granted organizational-level factors. For example, a focus on performance at the asset level may lead to ignore performance measures at the business unit level. The governance perspective on asset management usually concentrates on organizational factors, and measures performance in financial terms. In doing so, the governance perspective tends to ignore the engineering considerations required for optimal asset performance. These two perspectives often take each other for granted. However experience demonstrates that an exclusive focus on one or the other may lead to sub-optimal performance. For example, the two perspectives have different time frames: engineering considers the long term asset life-cycle whereas the organizational time frame is based on a yearly financial calendar. Asset fleets provide a relevant and important context to investigate the interaction between engineering and governance views on asset management as fleets have distributed system characteristics. In this project we investigate how engineering and governance perspectives can be reconciled and integrated to enable optimal asset and organizational performance in the context of asset fleets

    Performance-based building and innovation: Balancing client and industry needs

    Get PDF
    One reason for the interest in performance-based building is that it is commonly advocated as a powerful way of enhancing innovation performance by articulating building performance outcomes, and by offering relevant procurement actors the discretion to innovate to meet these performance requirements more effectively and/or efficiently. The paper argues that the current approach to performance-based building assumes that relevant actors have the capacity, ability and motivation to innovate from a business perspective. It is proposed that the prevailing conceptualization of PBB is too restrictive and should be broadened explicitly to accommodate the required business logic that must be in place before actors will innovate. The relevant performance-based building and innovation literature is synthesized to support the assertion. The paper concludes with an innovation-focused definition of performance-based building

    Distributed interoperable workflow support for electronic commerce.

    Get PDF
    Abstract. This paper describes a flexible distributed transactional workflow environment based on an extensible object-oriented framework built around class libraries, application programming interfaces, and shared services. The purpose of this environment is to support a range of EC-like business activities including the support of financial transactions and electronic contracts. This environment has as its aim to provide key infrastructure services for mediating and monitoring electronic commerce.

    Customer Enquiry Management in a Global Competitive Context: A Comparative Multi-Case Study Analysis

    Get PDF
    Business-to-Business (B2B) relationships, such as between a manufacturer and a customer, are increasingly important during the Customer Enquiry Management (CEM) process, particularly so for non-Make-To-Stock (non-MTS) companies operating in industrial markets. Few empirical studies have explored the CEM practices adopted by firms in practice. A study of the Italian capital goods sector by Zorzini et al. (2007) is a recent exception. Moreover, most studies have approached CEM from a cross-department integrated perspective but in the digital economy, and with globalization, outsourcing and extended supply chains, CEM needs to be approached from a broader supply chain-oriented perspective, incorporating B2B exchanges. This paper builds on the study by Zorzini et al. (2007) by conducting multi-case study research with seven UK-based companies in the capital goods sector, including three sales and support companies with offshore manufacturing. By adopting a cross-national research perspective, it assesses whether the proposed theory applies to other capital goods firms outside Italy. By also adopting a supply chain perspective of CEM it investigates current industry practice in B2B markets and explores whether cross-functional coordination and formalization issues can be extended into a global context. Evidence from the UK generally supports prior theory, confirming links between high levels of coordination, formalization of the CEM process and improved performance. Some refinements are proposed, for example, in order to make the theory suitable for a global context. The characteristics of a supply chain are important factors that affect CEM. This research has managerial implications for improving the CEM process in non-Make-To-Stock (non-MTS) capital goods companies from both an intra and an inter-organisational (B2B) perspective. Coordination with partners along the supply chain is needed at the enquiry stage and constraints linked to global customers should be considered when structuring the

    IT in construction: aligning IT and business strategies

    Get PDF
    The extent to which information technology (IT) infrastructures and strategies are aligned with business processes and strategies varies widely along firms. The objective of this paper is to explain the success or failure of IT in construction firms by focusing on the alignment (or lack of it) between business strategy, IT strategy, organizational infrastructure, and IT infrastructure. It is hypothesized that the ‘fit’ among these elements, the domains of the Strategic Alignment Model, is positively related to the Business Value of IT in Construction. The IT Business Value is evaluated in terms of efficiency, effectiveness and business performance. By applying the Strategic Alignment Model to the Dutch construction industry, it is shown that the inadequate alignment between these domains is a major reason for the modest added business value from IT investments in this industry. The first lack of alignment is the technology shortfall: hence IT contributes in an inadequate way to strategic processes of construction firms. The second lack of alignment is the strategy-shortfall: hence the firm strategy impedes the implementation of IT that could generate a high business value

    Delays and Cost Overruns in Infrastructure Projects -- An Enquiry into Extents, Causes and Remedies

    Get PDF
    Media reports abound on instances of prolonged delays and excessive cost overruns in infrastructure projects. Only a small number of projects get delivered in time and within the budget. Examples of successful project implementation, like construction of the Delhi Metro Rail, are few and appear only far in between. Indeed, the problem of time and cost overruns in India is widespread and severe. Yet, very few empirical studies exist on the subject. Even rarer are the studies based on completed projects. As a result, the extents as well as the causes behind delays and cost overruns have remained under-researched. This study investigates the various issues related to delays and cost overruns in publically funded infrastructure projects. The following questions are posed and answered -- How common and how large are the time and the cost overruns? What are the essential causes behind these delays and cost overruns? Are the underlying causes statistically significant? Are Contractual and Institutional failures among the significant causes? What are the policy implications for planning, development and implementation of infrastructure projects? The study is based on, by far, the largest dataset of 894 projects from seventeen infrastructure sectors. Among other results, it shows that the contractual and the institutional failures are economically and statistically significant causes behind cost and time overruns.Delays, Cost Overruns, Time Overruns, Infrastructure, Projects, Causes, Contractual Failures, Organizational Failures, Institutional Failures

    Supporting knowledge exchange isn't easy: lessons learnt from a case study

    Get PDF
    A knowledge management system is introduced in a large insurance company. It is meant to become a virtual knowledge network for a group of insurance professionals. Despite the fact that the introduction was met with enthusiasm and user participation in the design was ensured, the system did not live up to the expectations. In this paper we investigate this failure by uncovering and analyzing the requirements engineering processes underlying the system's\ud conception, design and introduction. The demise of the system can be attributed to a lack of attention for the use context of the end users and a tendency in the development process to focus mostly on the technical solution instead of problem analysis

    Taming the ‘trolls’ : major public projects in the making

    Get PDF
    Major projects are not yet sufficiently understood, and practices in project governance and project management do not yet reflect the current state of knowledge of large, complex projects. In an attempt to understand the reasons, the authors therefore investigated the latest relevant findings documented in three countries: the UK, Norway, and the Netherlands. Their examination of the effect of implementing governance frameworks for public projects in these countries indicates that efforts to improve major projects are giving rewards: Even if complex public projects, the ‘trolls’, become more challenging, efforts to ‘tame’ them are improving. The results of the study show that project planning has improved and cost overruns are reduced. However, recent observations indicate that the effect may wear off remarkably quickly. Hence, the need for continuous improvement and change is prominent. There are fundamental limitations in the use of formal systems as they cannot detect all problems and there are limitations to humans' ability in terms of optimism bias that cannot be eliminated
    • …
    corecore