    Offshore wind installation: Analysing the evidence behind improvements in installation time

    Get PDF
    The most important single event of the last years in wind energy technology is the reduction in the cost of producing wind electricity offshore, a reduction that can reach 75%, depending on the system boundary considered, for installations commissioned by 2024. Surprisingly, there is very little scientific literature showing how this reduction is being achieved. The objective of this paper is to analyse the evidence behind cost reduction in one of the most significant cost elements of offshore wind farms, the installation of foundations and turbines. This cost is directly dependent on the daily rates of the installation vessels and on the days it takes to install those wind farm elements. Therefore, we collected installation data from 87 wind farms installed from 2000 to 2017, to establish the exact time for installation in each. The results show that advances have reached 70% reduction in installation times throughout the period for the whole set, turbine plus foundation. Most of these improvements (and the corresponding impact in reducing costs) relate to the larger size of turbines installed nowadays. There is, therefore, not any leap forward in the installation process, but only incremental improvements applied to turbines that are now four times as large as in 2000

    Scheduling of offshore wind farm installation using simulated annealing

    Get PDF
    This paper focuses on the scheduling problem in the offshore wind farm installation process, which is strongly influenced by the offshore weather condition. Due to the nature of the offshore weather condition, i.e., partially predictable and uncontrollable, it is urgent to find a way to schedule the offshore installation process effectively and economically. For this purpose, this work presents a model based on Timed Petri Nets (TPN) approach for the offshore installation process and applies simulated annealing algorithm to find the optimal schedule

    Hybrid AC/DC Transmission Expansion Planning Considering HVAC to HVDC Conversion Under Renewable Penetration

    Full text link
    In this paper, a dynamic (i.e. multi-year) hybrid model is presented for Transmission Expansion Planning (TEP) utilizing the High Voltage Alternating Current (HVAC) and multiterminal Voltage Sourced Converter (VSC)-based High Voltage Direct Current (HVDC) alternatives. In addition to new HVAC and HVDC lines, the possibility of converting existing HVAC transmission lines to HVDC lines is considered in the proposed model. High shares of renewable resources are integrated into the proposed hybrid AC/DC TEP model. Due to the intermittency of renewable resources, the planning of large-scale Energy Storage (ES) devices is considered. In order to accurately estimate the total TEP costs and hence capturing the scenarios of load and renewable generation uncertainty, using a clustering approach, each year of the planning horizon is replaced with four representative days. The proposed model is formulated as a Mixed-Integer Linear Programming (MILP) problem. Using Benders Decomposition (BD) algorithm, the proposed model is decomposed into a Master investment problem to handle the decision variables, and Sub-problems to check the feasibility of master problem solution and optimize the operation and ES investment cost. Three test systems are used as case studies to demonstrate the effectiveness of the proposed hybrid AC/DC TEP model

    LowEmission Annual report 2022

    Get PDF
    publishedVersio

    An optimisation model for scheduling the decommissioning of an offshore wind farm

    Get PDF
    An optimisation model is proposed for scheduling the decommissioning of an offshore wind farm in order to minimise the total cost which is comprised of jack-up vessel, barge (transfer) vessel, inventory, processing and on-land transportation costs. This paper also presents a comprehensive review of the strategic issues relating to the decommissioning process and of scheduling models that have been applied to offshore wind farms. A mathematical model using integer linear programming is developed to determine the optimal schedule considering several constraints such as the availability of vessels and planning delays. As the decommissioning problem is challenging to solve, a matheuristic approach based on the hybridisation of a heuristic approach and an exact method is also proposed to find near optimal solutions for a test set of problems. A set of computational experiments has been carried out to assess the proposed approach

    A reliability-and-cost-based fuzzy approach to optimize preventive maintenance scheduling for offshore wind farms

    Get PDF
    This is the author accepted manuscript. The final version is available from Elsevier via the DOI in this recordWe study the preventive maintenance scheduling problem of wind farms in the offshore wind energy sector which operates under uncertainty due to the state of the ocean and market demand. We formulate a fuzzy multi-objective non-linear chance-constrained programming model with newly-defined reliability and cost criteria and constraints to obtain satisfying schedules for wind turbine maintenance. To solve the optimization model, a 2-phase solution framework integrating the operational law for fuzzy arithmetic and the non-dominated sorting genetic algorithm II for multi-objective programming is developed. Pareto-optimal solutions of the schedules are obtained to form the trade-offs between the reliability maximization and cost minimization objectives. A numerical example is illustrated to validate the model.Recruitment Program of High-end Foreign Expert
    • …