44,041 research outputs found
The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe
Time-delayed models of gene regulatory networks
We discuss different mathematical models of gene regulatory networks as relevant to the onset and development of cancer. After discussion of alternativemodelling approaches, we use a paradigmatic two-gene network to focus on the role played by time delays in the dynamics of gene regulatory networks. We contrast the dynamics of the reduced model arising in the limit of fast mRNA dynamics with that of the full model. The review concludes with the discussion of some open problems
Evolving Ensemble Fuzzy Classifier
The concept of ensemble learning offers a promising avenue in learning from
data streams under complex environments because it addresses the bias and
variance dilemma better than its single model counterpart and features a
reconfigurable structure, which is well suited to the given context. While
various extensions of ensemble learning for mining non-stationary data streams
can be found in the literature, most of them are crafted under a static base
classifier and revisits preceding samples in the sliding window for a
retraining step. This feature causes computationally prohibitive complexity and
is not flexible enough to cope with rapidly changing environments. Their
complexities are often demanding because it involves a large collection of
offline classifiers due to the absence of structural complexities reduction
mechanisms and lack of an online feature selection mechanism. A novel evolving
ensemble classifier, namely Parsimonious Ensemble pENsemble, is proposed in
this paper. pENsemble differs from existing architectures in the fact that it
is built upon an evolving classifier from data streams, termed Parsimonious
Classifier pClass. pENsemble is equipped by an ensemble pruning mechanism,
which estimates a localized generalization error of a base classifier. A
dynamic online feature selection scenario is integrated into the pENsemble.
This method allows for dynamic selection and deselection of input features on
the fly. pENsemble adopts a dynamic ensemble structure to output a final
classification decision where it features a novel drift detection scenario to
grow the ensemble structure. The efficacy of the pENsemble has been numerically
demonstrated through rigorous numerical studies with dynamic and evolving data
streams where it delivers the most encouraging performance in attaining a
tradeoff between accuracy and complexity.Comment: this paper has been published by IEEE Transactions on Fuzzy System
Project scheduling under undertainty – survey and research potentials.
The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;
- …