1,316,181 research outputs found

    Framework Programmable Platform for the Advanced Software Development Workstation (FPP/ASDW). Demonstration framework document. Volume 1: Concepts and activity descriptions

    Get PDF
    The Framework Programmable Software Development Platform (FPP) is a project aimed at effectively combining tool and data integration mechanisms with a model of the software development process to provide an intelligent integrated software development environment. Guided by the model, this system development framework will take advantage of an integrated operating environment to automate effectively the management of the software development process so that costly mistakes during the development phase can be eliminated. The Advanced Software Development Workstation (ASDW) program is conducting research into development of advanced technologies for Computer Aided Software Engineering (CASE)

    Framework Programmable Platform for the advanced software development workstation: Framework processor design document

    Get PDF
    The design of the Framework Processor (FP) component of the Framework Programmable Software Development Platform (FFP) is described. The FFP is a project aimed at combining effective tool and data integration mechanisms with a model of the software development process in an intelligent integrated software development environment. Guided by the model, this Framework Processor will take advantage of an integrated operating environment to provide automated support for the management and control of the software development process so that costly mistakes during the development phase can be eliminated

    A Model-Driven Approach for Business Process Management

    Get PDF
    The Business Process Management is a common mechanism recommended by a high number of standards for the management of companies and organizations. In software companies this practice is every day more accepted and companies have to assume it, if they want to be competitive. However, the effective definition of these processes and mainly their maintenance and execution are not always easy tasks. This paper presents an approach based on the Model-Driven paradigm for Business Process Management in software companies. This solution offers a suitable mechanism that was implemented successfully in different companies with a tool case named NDTQ-Framework.Ministerio de Educación y Ciencia TIN2010-20057-C03-02Junta de Andalucía TIC-578

    Estimation of Defect proneness Using Design complexity Measurements in Object- Oriented Software

    Full text link
    Software engineering is continuously facing the challenges of growing complexity of software packages and increased level of data on defects and drawbacks from software production process. This makes a clarion call for inventions and methods which can enable a more reusable, reliable, easily maintainable and high quality software systems with deeper control on software generation process. Quality and productivity are indeed the two most important parameters for controlling any industrial process. Implementation of a successful control system requires some means of measurement. Software metrics play an important role in the management aspects of the software development process such as better planning, assessment of improvements, resource allocation and reduction of unpredictability. The process involving early detection of potential problems, productivity evaluation and evaluating external quality factors such as reusability, maintainability, defect proneness and complexity are of utmost importance. Here we discuss the application of CK metrics and estimation model to predict the external quality parameters for optimizing the design process and production process for desired levels of quality. Estimation of defect-proneness in object-oriented system at design level is developed using a novel methodology where models of relationship between CK metrics and defect-proneness index is achieved. A multifunctional estimation approach captures the correlation between CK metrics and defect proneness level of software modules.Comment: 5 pages, 1 figur

    Refactoring Process Models in Large Process Repositories.

    Get PDF
    With the increasing adoption of process-aware information systems (PAIS), large process model repositories have emerged. Over time respective models have to be re-aligned to the real-world business processes through customization or adaptation. This bears the risk that model redundancies are introduced and complexity is increased. If no continuous investment is made in keeping models simple, changes are becoming increasingly costly and error-prone. Though refactoring techniques are widely used in software engineering to address related problems, this does not yet constitute state-of-the art in business process management. Process designers either have to refactor process models by hand or cannot apply respective techniques at all. This paper proposes a set of behaviour-preserving techniques for refactoring large process repositories. This enables process designers to eectively deal with model complexity by making process models better understandable and easier to maintain

    Process capability assessments in small development firms

    Get PDF
    [Abstract}: Assessment-based Software Process Improvement (SPI) programs such as the Capability Maturity Model (CMM), Bootstrap, and SPICE (ISO/IEC 15504) are based on formal frameworks and promote the use of systematic processes and management practices for software development. These approaches identify best practices for the management of software development and when applied, enable organizations to understand, control and improve development processes. The purpose of a SPI assessment is to compare the current processes used in an organization with a list of recommended or ‘best’ practices. This research investigates the adoption of SPI initiatives by four small software development firms. These four firms participated in a process improvement program which was sponsored by Software Engineering Australia (SEA) (Queensland). The assessment method was based on SPICE (ISO/IEC 15504) and included an initial assessment, recommendations, and a follow-up meeting. For each firm, before and after snapshots are provided of the capability as assessed on eight processes. The discussion which follows summarizes the improvements realized and considers the critical success factors relating to SPI adoption for small firms
    corecore