30,833 research outputs found
AI for the Common Good?! Pitfalls, challenges, and Ethics Pen-Testing
Recently, many AI researchers and practitioners have embarked on research
visions that involve doing AI for "Good". This is part of a general drive
towards infusing AI research and practice with ethical thinking. One frequent
theme in current ethical guidelines is the requirement that AI be good for all,
or: contribute to the Common Good. But what is the Common Good, and is it
enough to want to be good? Via four lead questions, I will illustrate
challenges and pitfalls when determining, from an AI point of view, what the
Common Good is and how it can be enhanced by AI. The questions are: What is the
problem / What is a problem?, Who defines the problem?, What is the role of
knowledge?, and What are important side effects and dynamics? The illustration
will use an example from the domain of "AI for Social Good", more specifically
"Data Science for Social Good". Even if the importance of these questions may
be known at an abstract level, they do not get asked sufficiently in practice,
as shown by an exploratory study of 99 contributions to recent conferences in
the field. Turning these challenges and pitfalls into a positive
recommendation, as a conclusion I will draw on another characteristic of
computer-science thinking and practice to make these impediments visible and
attenuate them: "attacks" as a method for improving design. This results in the
proposal of ethics pen-testing as a method for helping AI designs to better
contribute to the Common Good.Comment: to appear in Paladyn. Journal of Behavioral Robotics; accepted on
27-10-201
Complexity in the Context of Information Systems Project Management
Complexity is an inherent attribute of any project. The purpose of defining and documenting complexity is to enable a project team to foresee resulting challenges in a timely manner, and take steps to alleviate them.The main contribution of this article is to present a systematic view of complexity in project management by identifying its key attributes and classifying complexity by these attributes. A “complexity taxonomy” is developed and discussed within three levels: the product, the project and the external environment.Complexity types are described through simple real-life examples. Then a framework (tool) is developed for applying the notion of complexity as an early warning tool.The article is intended for researchers in complexity, project management, information systems, technology solutions and business management, and also for information specialists, project managers, program managers, financial staff and technology directors
Analysis and control of complex collaborative design systems
This paper presents a novel method for modelling the complexity of collaborative design systems based on its analysis and proposes a solution to reducing complexity and improving performance of such systems. The interaction and interfacing properties among many components of a complex design system are analysed from different viewpoints and then a complexity model for collaborative design is established accordingly. In order to simplify complexity and improve performance of collaborative design, a general solution of decomposing a whole system into sub-systems and using unified interface mechanism between them has been proposed. This proposed solution has been tested with a case study. It has been shown that the proposed solution is meaningful and practical
Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector
This is an accepted manuscript of an article published by Emerald in Journal of Engineering, Design and Technology on 09/05/2020: https://doi.org/10.1108/JEDT-01-2020-0007
The accepted version of the publication may differ from the final published version.Purpose
The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects.
Design/methodology/approach
To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework.
Findings
Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information.
Practical implications
This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required.
Originality/value
By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented
CHALLENGES TO DESIGN A DISTRIBUTED DATABASE USING UML AND MERISE
oai:ojs2.ijact.org:article/1Up-front handling of the prior and specific factors in the design of distributed database is an important factor that can influence the effectiveness of its implementation. In this paper, we aim at highlighting the major and specific constraints of a distributed database in the approaches of the MERISE and UML methods that can have a negative impact on the implementation of their results and thus deserve the attention of a researcher to create a new and appropriate method
- …