5 research outputs found

    Precision Enhancement of Distribution System State Estimation via Tri-Objective Micro Phasor Measurement Unit Deployment

    Full text link
    A tri-objective optimal Micro Phasor Measurement Units ({\mu}-PMUs) Placement method is presented, with a focus on minimizing the following three parameters: i) the total number of {\mu}-PMU channels, (ii) the maximum state estimation uncertainty, and (iii) the sensitivity of state estimation to line parameter tolerances. The suggested formulation takes single-line and {\mu}-PMU failures into consideration while guaranteeing the complete observability of the system in the presence and absence of contingencies. It also takes into account the impact of zero injection nodes and the quantity of {\mu}-PMU channels carried out at every node. The suggested placement issue is addressed using a customized version of the nondominated sorting genetic algorithm II (NSGA-II). According to the results achieved utilizing three test systems of varying sizes, {\mu}-PMU channels beyond predetermined thresholds only result in higher costs and negligible further decreases in state estimation uncertainty and sensitivity to line parameter tolerances. Additionally, we may omit to instrument between 30 and 40% of buses if {\mu}-PMUs with only two three-phase channels are utilized, with only a modest negative effect on state estimate performance even in the event of contingencies

    電力系統の静的および動的セキュリティ評価増強のための同期位相計測装置の最適配置

    Get PDF
    九州工業大学博士学位論文 学位記番号:工博甲第490号 学位授与年月日:令和2年3月25日1 INTRODUCTION|2 PMU-BASED POWER SYSTEM MONITORING AND CONTROL|3 OPTIMAL PMU PLACEMENT PROBLEM AND STATE ESTIMATION|4 MULTI OBJECTIVE PMU PLACEMENT WITH CURRENT CHANNEL SELECTION|5 INFLUENCE OF MEASUREMENT UNCERTAINTY PROPAGATION IN PMU PSEUDO MEASUREMENT|6 PHASOR-ASSISTED VOLTAGE STABILITY ASSESSMENT BASED ON OPTIMALLY PLACED PMUS|7 PMU PLACEMENT FOR DYNAMIC VULNERABILITY ASSESSMENT|8 CONCLUSIONS九州工業大学令和元年

    A Novel Multiobjective OPP for Power System Small Signal Stability Assessment Considering WAMS Uncertainties

    No full text
    In this paper, a multiobjective optimization method for the placement of phasor measurement units (PMUs) is proposed. The proposed method simultaneously considers different objectives including the power system small signal stability, the probability of system observability, and the total cost of PMUs. In the proposed optimal PMUs placement (OPP) model, wide area measurement system (WAMS) uncertainties and network configuration changes are also considered, while the variable cost of PMUs, based on the number of PMU channels is also observed. The elitist nondominated sorting genetic algorithm (NSGA-II) is used to obtain the Pareto optimal solutions and the best compromise final solution is selected by the decision maker on the basis of his priorities. Some simulation results on different test systems in different scenarios are presented and discussed. They confirmed that the proposed multiobjective model provides effective information for small signal stability assessment with minimum PMU cost in the presence of uncertainties
    corecore