757 research outputs found

    Solution of a truss topology bilevel programming problem by means of an inexact restoration method

    Get PDF
    We formulate a truss topology optimization problem as a bilevel programming problem and solve it by means of a line search type inexact restoration algorithm. We discuss details of the implementation and show results of numerical experiments.We formulate a truss topology optimization problem as a bilevel programming problem and solve it by means of a line search type inexact restoration algorithm. We discuss details of the implementation and show results of numerical experiments.301109125CNPQ - CONSELHO NACIONAL DE DESENVOLVIMENTO CIENTÍFICO E TECNOLÓGICOFAPERJ - FUNDAÇÃO CARLOS CHAGAS FILHO DE AMPARO À PESQUISA DO ESTADO DO RIO DE JANEIROFAPESP - FUNDAÇÃO DE AMPARO À PESQUISA DO ESTADO DE SÃO PAULOE-26/171.164/2003-APQ106/53768-

    The N-K Problem in Power Grids: New Models, Formulations and Numerical Experiments (extended version)

    Get PDF
    Given a power grid modeled by a network together with equations describing the power flows, power generation and consumption, and the laws of physics, the so-called N-k problem asks whether there exists a set of k or fewer arcs whose removal will cause the system to fail. The case where k is small is of practical interest. We present theoretical and computational results involving a mixed-integer model and a continuous nonlinear model related to this question.Comment: 40 pages 3 figure

    Solving Mathematical Programs with Equilibrium Constraints as Nonlinear Programming: A New Framework

    Full text link
    We present a new framework for the solution of mathematical programs with equilibrium constraints (MPECs). In this algorithmic framework, an MPECs is viewed as a concentration of an unconstrained optimization which minimizes the complementarity measure and a nonlinear programming with general constraints. A strategy generalizing ideas of Byrd-Omojokun's trust region method is used to compute steps. By penalizing the tangential constraints into the objective function, we circumvent the problem of not satisfying MFCQ. A trust-funnel-like strategy is used to balance the improvements on feasibility and optimality. We show that, under MPEC-MFCQ, if the algorithm does not terminate in finite steps, then at least one accumulation point of the iterates sequence is an S-stationary point
    corecore