5 research outputs found

    KY-CTDS Kentucky Contract Time Determination System (KYSPR 99-195-lF)

    Get PDF
    This paper reports on the results of research that was funded by the Kentucky Transportation Cabinet (KyTC) to develop a new method for determining construction contract time for its highway construction contracts. The current and other DOT systems were analyzed to determine how a new system could provide better estimated duration. It was pre-determined that a PC computer based system was best suited. The development of the system input was developed from KyTC engineers with construction experience. The study advisory committee worked with Kentucky Transportation Center research engineers to develop the basis for the new contract time determination system, called KY-CTDS. The KY-CTDS program provides a conceptual estimating tool for predicting construction contract time for the Kentucky Department of Highways. It uses the pre-determined project classifications with only the major activities that control the project duration. Production rates and activity relationships were determined and are included in the program. Final adjustments in the project can be easily made by KyTC engineers. This system utilizes Microsoft Project® 98 and Microsoft Excel® Version 7.0 software operating on a personal computer. System outputs include a graphical bar chart schedule for estimating the contract time for bidding purposes. System output may also help in resolving construction disputes. The program is not suitable for detailed scheduling of construction operations

    The Paris to Lexington Road Reconstruction Project

    Get PDF
    This report summarizes the effort to provide the Kentucky Transportation Cabinet with an evaluation of the results obtained for the Paris to Lexington Road Reconstruction Project from 1997 to 2001. A unique pre-qualification process was used for the project to select a fixed pool of contractor to provide input to the design and to bid on the work. The research started in 1996 during the design process and continued following construction until September of 2001. Input was received from the Cabinet personnel working on the project, from the design firms, from the contractors, from the property owners involved, and from the citizen\u27s advisory committee overseeing the project. This was an environmentally sensitive project requiring special design and construction practices to meet the project objectives. An evaluation was done on 15 key project attributes and the project cost. Although more expensive than traditional highway projects the project was very successful. It is an example of how a highway department can successfully partner with the other stakeholders in a historic and environmentally sensitive project. Several observations and conclusions are included in the report

    Evaluation of Working Capacity for Disadvantaged Business Enterprises (DBE) For Highway Construction in Kentucky, FY 2004 Update

    Get PDF
    The Kentucky Transportation Center gathered the appropriate information, performed a series of computations and analyses, prepared the attached documentation, and makes the following recommendations to the Kentucky Transportation Cabinet for their DBE goal for Federal Fiscal year 2004 (October 1, 2003 - September 30, 2004). KTC recommends an overall DBE goal of 9.26%, of which 1.931% is anticipated to be satisfied by race/gender neutral prime contracts, and the resultant 7.33% should established as race/gender conscious subcontracts. The overall DBE goal figures stated here addresses an adjustment of 1.326% for the positive historical goal variance observed for the past eight years

    Development of a Critical Path Method Specification and a Training Program for use of CPM for KyTC

    Get PDF
    The Critical Path Method scheduling technique is outlined as it applies to KYTC projects. Special Provision 82 (94) and its requirements are outlined