22 research outputs found

    Effectiveness of using WiFi technologies to detect and predict building occupancy

    Full text link
    This paper presents findings of a case-study demonstrating the effectiveness of using WiFi networks to detect occupancy as opposed to CO2 sensors, commonly used for demand-controlled heating, ventilation and air conditioning (HVAC) systems. The study took place in one building at the University of Manitoba Fort Garry campus in Canada. In a classroom, the number of WiFi connections was collected on an hourly basis over one-week, simultaneously with CO2 concentration levels at 10-min intervals. The number of occupants in this classroom was also counted on an hourly basis over the same study period. Data analysis showed that WiFi counts predicted actual occupancy levels more accurately than CO2 concentration levels, thus validating the use of this technology to track occupancy. This study was the first to use both CO2 concentration and WiFi counts simultaneously as indicators for occupancy. Results demonstrated the possibility of using WiFi counts in large buildings for controlling HVAC systems at a higher accuracy and lower cost than other sensor technologies

    BIM and GIS applications in bridge projects : a critical review

    Get PDF
    In recent years, interest in BIM and GIS applications in civil engineering has been growing. For bridge engineering, BIM/GIS applications such as simulation, visualization, and secondary development have been used to assist practitioners in managing bridge construction and decision-making, including selection of bridge location maintenance decisions. In situ 3D modelling of existing bridges with detailed images from UAV camera has allowed engineers to conduct remote condition assessments of bridges and decide on required maintenance actions. Several studies have investigated the applications of BIM/GIS technology on bridge projects. However, there has been limited focus on reviewing the outcomes of these studies to identify the limitations of BIM and GIS applications on bridge projects. Therefore, the aim of this study was to review the research on BIM/GIS technology applications in bridge projects over the last decade. Using a systematic review process, a total of 90 publications that met the inclusion criteria were reviewed in this study. The review identified the state-of-the-art methods of BIM and GIS applications, respectively, at the planning and design, construction, and operation and maintenance phases of bridge projects. However, the findings point to segregated application of BIM and GIS at all phases of bridge projects. The findings of this study will contribute to guiding practitioners in selecting appropriate BIM and GIS technologies for different aspects of bridge projects

    Understanding the key takeaway of construction robots towards construction automation

    Full text link
    Purpose: The construction industry is the major sector in China but it has been exposed to a series of problems including low productivity and workforce shortage. However, construction robots as an effective and sustainable approach to overcome the difficulties in construction industry have not been widely adopted. Few studies attempted to investigate on the adoption of construction robots in China. In order to fill this gap, this study aim to address the barriers to the adoption of construction robots in China. Design/methodology/approach: Through literature review, semi-structured interview 24 factors hindering the adoption of construction robots are summarized. Next, a total of valid 150 questionnaires delivered to the 7 stakeholders were collected. Ranking analysis was used to identify 21 critical factors was determined by the mean score analysis and factor analysis extracted 21 critical factors into 5 clusters. Findings: Results indicate that the “technological performance and management” cluster is the most dominant of the 5 clusters. The most important barrier is “Limited research and design input”, followed by “High purchase cost” and “Unstructured construction environment”. Construction robots are still under R&D have had limited field applications in the production and construction process. Originality/value: The research findings provide a useful reference for different stakeholders to identify the critical factors appropriate strategies to promote the adoption of construction robots. Furthermore, this study provides recommendations to promote adoption of construction robots
    corecore