    ESS RFQ: Construction Status and Power Couplers Qualification

    No full text
    International audienceThe 352 MHz Radio Frequency Quadrupole (RFQ) for the European Spallation Source ERIC (ESS) will be de-livered during 2019. It is provided by CEA, IRFU, Sac-lay/France. It consists of five sections with a total length of 4.6 m and accelerates the proton beam from 75 keV up to 3.6 MeV. It will be feed with 1.6 MW peak power through two coaxial loop couplers. This paper will present the manufacturing status of the five sections and the qualification test of the RF power couplers

    The Saclay Test Stand for Conditioning the ESS RFQ Power Couplers at High RF Power

    No full text
    International audienceThe RF power coupler system for the RFQ of the ESS LINAC will feed 1.6 MW peak power through two coaxial loop couplers for a 352.21 MHz operation at the expected duty cycle. A specific test stand has been designed to condition the power couplers, and test the different auxiliary components in the nominal conditions of the RFQ. The power couplers were successfully assembled, installed and instrumented on the test cavity. This paper presents the general layout of the test stand, the installation and preparation of the power couplers for their conditioning at high RF power up to the ESS nominal conditions

    The SARAF-LINAC Project 2017 Status

    No full text
    International audienceSNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project). This paper presents to the accelerator community the status at March 2017 of the SARAF-LINAC Project