    Status and specifications of a Project X front-end accelerator test facility at Fermilab

    Get PDF
    This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility.Comment: 3 pp. Particle Accelerator, 24th Conference (PAC'11) 2011. 28 Mar - 1 Apr 2011. New York, US

    DESIGN AND HIGH POWER TESTING OF 52.809 MHZ RF CAVITIES FOR SLIP STACKING IN THE FERMILAB RECYCLER*

    Get PDF
    Abstract For NOvA and future experiments requiring high intensity proton beams, Fermilab is in the process of upgrading the existing accelerator complex for increased proton production. One such improvement is to reduce the Main Injector cycle time, by performing slip stacking, previously done in the Main Injector, in the now repurposed Recycler Ring. Recycler slip stacking requires two new RF cavities operating at slightly different frequencies (df = 1260Hz). These are copper, coaxial, quarter wave cavities with R/Q =13 ohms. They operate at a peak gap voltage of 150 kV with 150 kW peak drive power (60% duty factor), and are resonant at 52.809 MHz with a 10 kHz tuning range. Two have been completed and installed. The design, high power test results, and status of the cavities are presented
    • …
    corecore