    On Hilberg's Law and Its Links with Guiraud's Law

    Full text link
    Hilberg (1990) supposed that finite-order excess entropy of a random human text is proportional to the square root of the text length. Assuming that Hilberg's hypothesis is true, we derive Guiraud's law, which states that the number of word types in a text is greater than proportional to the square root of the text length. Our derivation is based on some mathematical conjecture in coding theory and on several experiments suggesting that words can be defined approximately as the nonterminals of the shortest context-free grammar for the text. Such operational definition of words can be applied even to texts deprived of spaces, which do not allow for Mandelbrot's ``intermittent silence'' explanation of Zipf's and Guiraud's laws. In contrast to Mandelbrot's, our model assumes some probabilistic long-memory effects in human narration and might be capable of explaining Menzerath's law.Comment: To appear in Journal of Quantitative Linguistic

    Typical forms of damage in prefabricated concrete buildings

    No full text
    Uszkodzenia występujące we wszystkich typach budynków wzniesionych metodami uprzemysłowionymi można podzielić na dwie grupy. Pierwszą z nich stanowią te, które są bardzo zbliżone lub analogiczne do uszkodzeń występujących w budownictwie tradycyjnym. Występują one najczęściej w elementach wykonywanych w miejscu wbudowania (np. uszkodzenia na ściankach działowych, pokryciu dachu, uszkodzenia instalacji). Do drugiej grupy należą te uszkodzenia, które nie są charakterystyczne dla budownictwa tradycyjnego, ale są ściśle związane z poszczególnymi technologiami w budownictwie prefabrykowanym. W artykule przedstawiono typowe uszkodzenia występujące w budynkach, które są skutkiem popełnianych wad montażowych i eksploatacyjnych.The types of damage occurring in all types of buildings built using industrialized methods can be divided into two groups. The first consists of damage which is analogous to or very similar to types of damage occurring in traditional construction. These most often appear in those elements which are made on site (e.g. damage to dividing walls, roof and installations). The second group consists of damage which is not generally found in traditional buildings, but is closely linked to the particular technologies used in prefabricated construction. This article describes typical forms of damage occurring in buildings as a result of faults in assembly and use of the buildings

    The whole truth about prefabricated concrete buildings

    No full text
    Intensywny rozwój budownictwa, zapoczątkowany w latach 50-tych XX wieku, ujawnił w skali całego kraju duże trudności w zaopatrzeniu w cegłę ceramiczną oraz zapewnieniu niezbędnej grupy murarzy. Dlatego w różnych ośrodkach kraju, rozpoczęły się eksperymenty w zakresie zastąpienia dotychczasowych, pracochłonnych technologii murarskich metodami bardziej uprzemysłowionymi. Polegały one między innymi na zastosowaniu dużych prefabrykowanych elementów ściennych o ciężarze zbliżonym do możliwości udźwigu wieżowych żurawi budowlanych. Elementy ścienne wykonywane były seryjnie w specjalnie zaprojektowanych poligonach lub w zamkniętych zakładach prefabrykacji, przy zastosowaniu odpowiedniej mechanizacji produkcji, a ich tworzywem był beton żwirowy, żużlobeton i gazobeton. Czy budownictwo wielkopłytowe spełniło swoje zadanie i jaki jest jego obecny stan?The intense development of construction from the 1950s onwards led to significant difficulties all over the country in obtaining ceramic bricks and providing the necessary teams of bricklayers. Hence experiments were undertaken at various institutions to find more industrialized alternatives to the existing labour-intensive masonry techniques. One of the features of the new technologies was the use of large prefabricated wall elements, weighing close to the maximum that could be lifted by building cranes. These elements were mass produced on specially designed testing grounds or in closed prefabrication plants, using appropriate means of mechanization of production, and using gravel concrete, slag concrete and aerated concrete as raw materials. Did this construction technology achieve its goals, and what is its current state

    Anchoring-safety analysis related to the textured layer of the ‘great panel’ pre-fabricated elements after thermal insulation works are executed.

    No full text
    W artykule przedstawiono przegląd metodologii oceny stanu technicznego warstwy fakturowej w trójwarstwowych elementach ściennych budownictwa wielkopłytowego oraz wyniki analizy obliczeniowej bezpieczeństwa warstwy fakturowej obciążonej dodatkowo ciężarem ocieplenia. W obliczeniach uwzględniono potencjalne wady materiałowo-wykonawcze (zmiana średnicy wieszaków m.in. wskutek korozji, zastosowanie różnych gatunków stali).The article presents the methodology review pertaining to the assessment of the technical status of the textured layer in the three-layered wall elements of the ‘great panel’ buildings, along with the results of the calculation analysis regarding safety of the textured layer which additionally needs to bear the load imposed by the thermal insulation. The calculation did take into account the potential faulty materials or execution of the works (change in the diameter of the hangers resulting from corrosion, using different steel-types)

    Technical status of the balcony elements in the ‘great panel’ buildings

    No full text
    Budownictwo wielkopłytowe, rozwinięte w latach 60. XX wieku, stanowiło w Polsce aż do połowy lat 80, podstawową formę budownictwa mieszkaniowego. Największy jego rozwój przypada na lata 70., kiedy powstawało najwięcej obiektów wznoszonych w systemach uprzemysłowionych w ramach dużych osiedli mieszkaniowych. Jakość wykonania elementów przygotowywanych w zakładach prefabrykacji, a zwłaszcza jakość montażu gotowych prefabrykatów na placu budowy pozostawiała wiele do życzenia.‘Great panel’ buildings (also known as the ‘Panelak’ buildings), developed back in the 1960’s became the basic form of housing structures until the mid-1980’s in Poland. These buildings were developed to the largest extent back in the 1970’s, when most of the structures were erected in an industrialized way, within the scope of large housing estates. The quality of the elements prepared at pre-fabrication facilities, and particularly the quality of the executed installation works related to the ready-made, pre-fabricated elements at the construction sites, certainly could have been improved

    Modernizacja historycznych zespołów mieszkaniowych w Pyskowicach

    No full text
    In an Upper Silesian town Pyskowice, there are three urban complexes: a historic center with traditionally arranged medieval buildings, a housing complex built before World War II for the needs of railway workers and a housing estate built in connection with a planned vast industrial investment for its workers in the socialist realism times. The first complex was subject to the slow transformations related to the cultural changes characteristic for the European culture. Despite the dramatic misfortunes, its 13th-century origins preserved. The two remaining complexes were built as houses for new economic investments. At present, the communities of the estates face the problem of how to further develop the ideological remnants of the estates on their own. A problem of functional integration of the housing complexes, designed as separate ones, occurred. The modernisation works, related to the town development, refer to the fields of town planning and architecture. They also make it possible to observe the technical and technological advancements of the times they were erected. The presented examples of the modernisation works throw light on the cultural awareness of the designers and investors of the times and their understanding of the importance of the notion of surrounding. The newly arising architectural forms demonstrate an interesting reference to the local tradition and the existing forms.W górnośląskim mieście Pyskowice, funkcjonują trzy zespoły urbanistyczne: historyczne centrum w tradycyjnym układzie średniowiecznej zabudowy, zespół osiedlowy wybudowany na potrzeby pracowników kolei przed II wojną światową oraz socrealistyczne osiedle mieszkaniowe powstałe w związku z planowaną dużą inwestycją przemysłową, jako zaplecze dla jej pracowników. Pierwszy zespół poddany został powolnym przemianom związanym ze zmianami kulturowymi charakterystycznymi dla europejskiej kultury. Mimo gwałtownych zdarzeń losowych zachowało się jego XIII -wieczne założenie. Dwa pozostałe zespoły powstały, jako zaplecza mieszkaniowe związane z nowymi przedsięwzięciami gospodarczymi. Obecnie, społeczności osiedli stają wobec konieczności samodzielnego zagospodarowania pozostałości ideologicznego programu swoich osiedli. Zaistniał problem integracji funkcjonalnej, projektowanych, jako odrębne zespołów osiedlowych. Działania modernizacyjne związane z rozwojem miasta dotyczą zagadnień z dziedziny urbanistyki, architektury oraz pozwalają obserwować ich ówczesne zaawansowanie techniczne oraz technologiczne. Przedstawione przykłady działań modernizacyjnych mogą dać pojęcie o świadomości kulturowej twórców i inwestorów oraz ocenić ich sposób rozumienia kontekstu otoczenia. Interesujące jest odniesienie powstających form architektonicznych do tradycji lokalnej oraz stosunek do form zastanych

    Chromium (VI) desorption on activated carbon regenerated with sodium carbonate

    No full text
    Investigated was the potentiality of using sodium carbonate for the regeneration of activated carbons spent in the course of chromate onion desorption. The experiments were carried out on WD-extra carbon treated with muriatic acid for partial removal of ash particles. The regeneration procedure involved sodium carbonate and was conducted in a through-flow system. The desorption and sorption effects were related to three values of Na2CO3 concentration (2,5 and 10%) and two values of flow velocity (2 and 4 m/h). The best sorption effects were achieved on carbon regenerated with the 2% Na2CO3 solution. When use was made of increased (5% or 10%) sodium carbonate concentrations, consecutive sorptions were less effective. This finding, however, cannot be explained by the amount of the desorbed chromium. The sorption effects following the regeneration procedure were found to be adversely influenced by the local increase of pH in the micropores of the activated carbon. Of importance was also the overall number of the regeneration procedures performed. Each successive procedure reduced noticeably the adsorbing capacity of the carbon with respect to chromate onion. The contribution of flow velocity to the sorption effect was less distinct. However, the flow velocity of the Na2CO3 solution contributed markedly to the duration of the regenerating procedure and to the quantity of the reagent to be used. Thus, at the flow velocity of 2 m/h, the length of regeneration increased, whereas the quantity of the sodium carbonate used decreased