1,127 research outputs found

    Pedo-Geomorphic Elements of the Channel and Floodplain of a Small Nebraska Watershed

    Get PDF
    Pedologic and geomorphic data are combined in this study in an effort to delineate the areal extent of floodplains and possible extent of overbank flooding. Hydraulically, this procedure may prove most useful in studying flood routing problems on ungaged watersheds; however, it may be applied to previously studied catchments in an effort to define more accurately the areas of localized inflow and/or major hydrologic changes which may be expected to occur in a down-valley direction

    FEMA's Integration of Preparedness and Development of Robust Regional Offices

    Get PDF
    In October 2006, Congress enacted major legislation to reform the function and organization of the Federal Emergency Management Agency (FEMA) in response to the recognized failures in preparation for and response to Hurricane Katrina. The Post-Katrina Emergency Management Reform Act of 2006 (PKEMRA) focused national preparedness responsibilities within FEMA and directed additional resources and responsibilities to FEMA's ten regional offices. Directed by Congress, in October 2008 a National Academy Panel began an independent assessment of FEMA's integration of preparedness functions and progress in development of robust regional offices.Main FindingsOver the past three years, FEMA has taken significant steps in an effort to integrate preparedness and develop more robust regional offices. These efforts, undertaken by both the previous and current Administrations, are documented throughout this report and should be recognized and applauded. However, FEMA has yet to define specific goals and outcomes that would permit it, Congress or the public to determine when preparedness has been fully integrated into all aspects of FEMA's work and whether the development and ongoing operation of robust regional offices has been achieved. In the absence of well-defined, measurable outcome indicators, the National Academy Panel relied upon the assessments of FEMA leaders and staff, documentation provided by FEMA, and a review of secondary sources material to inform its findings and recommendations. Based upon this evidence, the Panel has concluded that, while progress has been made: (1) preparedness is not fully integrated across FEMA, (2) FEMA's regional offices do not yet have the capacity required to ensure the nation is fully prepared, (3) stakeholders are not yet full partners with FEMA in national preparedness, and (4) FEMA has ineffective internal business practices, particularly with regard to human resource management. The Panel made seven recommendations for FEMA:Establish a cross-organizational process, with participation from internal and external stakeholders, to develop a shared understanding of preparedness integrationEstablish a robust set of outcome metrics and standards for preparedness integration, as well as a system to monitor and evaluate progress on an ongoing basisWork to eliminate organizational barriers that are adversely impacting the full integration of preparedness across the agencyContinue to build regional office capacity and monitor implementation consistent with the Administrator's recent policy guidanceUndertake steps to improve the ongoing working relationship between headquarters and the regions in accord with Panel-identified principlesTake steps to improve stakeholder engagement and relationships at all levels in accord with Panel-identified principles; andStrengthen internal business practices, especially in the area of human capital planning

    Surficial Geology, Soils, and Plant Zonation Ross Biological Area

    Get PDF
    Plant distribution is investigated with regard to geologic, geomorphic, and pedologic influences. Little is known about the soil-plant relationship of native species. This study attempts to develop a basic concept that the native plant zonation can be described in terms of the above three factors simply on the basis of routine field investigations. Further studies may then be designed to bring about a more quantitative understanding of the actual nutrient and moisture regimes under which certain native species will be most commonly found

    Verifying, Challenging, and Discovering New Synapses Among Fully EM-Reconstructed Neurons in the Leech Ganglion

    Get PDF
    Neural circuits underpin the production of animal behavior, largely based upon the precise pattern of synaptic connectivity among the neurons involved. For large numbers of neurons, determining such “connectomes” by direct physiological means is difficult, as physiological accessibility is ultimately required to verify and characterize the function of synapses. We collected a volume of images spanning an entire ganglion of the juvenile leech nervous system via serial blockface electron microscopy (SBEM). We validated this approach by reconstructing a well-characterized circuit of motor neurons involved in the swimming behavior of the leech by locating the synapses among them. We confirm that there are multiple synaptic contacts between connected pairs of neurons in the leech, and that these synapses are widely distributed across the region of neuropil in which the neurons’ arbors overlap. We verified the anatomical existence of connections that had been described physiologically among longitudinal muscle motor neurons. We also found that some physiological connections were not present anatomically. We then drew upon the SBEM dataset to design additional physiological experiments. We reconstructed an uncharacterized neuron and one of its presynaptic partners identified from the SBEM dataset. We subsequently interrogated this cell pair via intracellular electrophysiology in an adult ganglion and found that the anatomically-discovered synapse was also functional physiologically. Our findings demonstrate the value of combining a connectomics approach with electrophysiology in the leech nervous system
    • …
    corecore