3 research outputs found

    Strength & Conduct of Reinforced Concrete Corner Joint under Negative Moment Effect

    Get PDF
    The aim of our study is to reveal the effect of steel reinforcement details,tensile steel reinforcement ratio, compressed reinforcing steel ratio,reinforcing steel size, corner joint shape on the strength of reinforcedconcrete Fc' and delve into it for the most accurate details and concreteconnections about the behavior and resistance of the corner joint ofreinforced concrete, Depending on the available studies and sources inaddition to our study, we concluded that each of these effects had a clearrole in the behavior and resistance of the corner joint of reinforced concreteunder the influence of the negative moment and yield stress. A studyof the types of faults that can be reinforced angle joints obtains detailsand conditions of crushing that are almost identical for all types of steelreinforcement details and the basic requirements for the acceptable behaviorof reinforced concrete joints in the installations and the efficiency of thejoint and this may help us to prepare for disasters, whether natural or other,as happens with tremors The floor and failure that may occur due to wrongdesigns or old buildings and the possibility of using those connections totreat those joints and sections in reinforced or unarmed concrete facilitiesto preserve the safety of humans and buildings from sudden disasters andreduce and reduce risks, as well as qualitative control over the productionof concrete connections and sections free from defects to the extreme

    Causes of Problems in Post-Disaster Emergency Re-Construction Projects— Iraq as a Case Study

    No full text
    This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are in line with findings from similar studies in other countries and regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. While many studies have examined factors causing delays and cost overruns, this study offers unique insights into factors that need to be considered when implementing projects for post disaster emergency reconstruction in areas impacted by wars and terrorism
    corecore