25 research outputs found

    First Beam Commissioning of the 400 MHz LHC RF System

    Get PDF
    Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities ware conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controllers and beam control electronics were tested and calibrated. Beam was successfully captured in ring 2, cavities phased, and a number of initial measurements made. These results are presented and tests and preparation for colliding beams in 2009 are outlined

    Localization of preformed Cooper pairs in disordered superconductors

    Get PDF
    International audienceThe most profound effect of disorder on electronic systems is the localization of the electrons transforming an otherwise metallic system into an insulator. If the metal is also a superconductor then, at low temperatures, disorder can induce a pronounced transition from a superconducting into an insulating state. An outstanding question is whether the route to insulating behaviour proceeds through the direct localization of Cooper pairs or, alternatively, by a two-step process in which the Cooper pairing is first destroyed followed by the standard localization of single electrons. Here we address this question by studying the local superconducting gap of a highly disordered amorphous superconductor by means of scanning tunnelling spectroscopy. Our measurements reveal that, in the vicinity of the superconductor-insulator transition, the coherence peaks in the one-particle density of states disappear whereas the superconducting gap remains intact, indicating the presence of localized Cooper pairs. Our results provide the first direct evidence that the superconductor-insulator transition in some homogeneously disordered materials is driven by Cooper-pair localization

    Clinical efficacy and safety of cefmenoxime in children.

    No full text
    corecore