2 research outputs found
A simulation-based software to support the real-time operational parameters selection of tunnel boring machines
With the fact that the main operational parameters of the construction process in mechanized tunneling are currently selected based on monitoring data and engineering experience without exploiting the advantages of computer methods, the focus of this work is to develop a simulation-based real-time assistant system to support the selection of operational parameters. The choice of an appropriate set of these parameters (i.e., the face support pressure, the grouting pressure, and the advance speed) during the operation of tunnel boring machines (TBM) is determined by evaluating different tunneling-induced soil-structure interactions such as the surface settlement, the associated risks on existing structures and the tunnel lining behavior. To evaluate soil-structure behavior, an advanced process-oriented numerical simulation model based on the finite cell method is utilized. To enable the real-time prediction capability of the simulation model for a practical application during the advancement of TBMs, surrogate models based on the Proper Orthogonal Decomposition and Radial Basis Functions (POD-RBF) are adopted. The proposed approach is demonstrated through several synthetic numerical examples inspired by the data of real tunnel projects. The developed methods are integrated into a user-friendly application called SMART to serve as a support platform for tunnel engineers at construction sites. Corresponding to each user adjustment of the input parameters, i.e., each TBM driving scenario, approximately two million outputs of soil-structure interactions are quickly predicted and visualized in seconds, which can provide the site engineers with a rough estimation of the impacts of the chosen scenario on structural responses of the tunnel and above ground structures
A simulation-based software to support the real-time operational parameters selection of tunnel boring machines
With the fact that the main operational parameters of the construction process in mechanized tunneling are currently selected based on monitoring data and engineering experience without exploiting the advantages of computer methods, the focus of this work is to develop a simulation-based real-time assistant system to support the selection of operational parameters. The choice of an appropriate set of these parameters (i.e., the face support pressure, the grouting pressure, and the advance speed) during the operation of tunnel boring machines (TBM) is determined by evaluating different tunneling-induced soil-structure interactions such as the surface settlement, the associated risks on existing structures and the tunnel lining behavior. To evaluate soil-structure behavior, an advanced process-oriented numerical simulation model based on the finite cell method is utilized. To enable the real-time prediction capability of the simulation model for a practical application during the advancement of TBMs, surrogate models based on the Proper Orthogonal Decomposition and Radial Basis Functions (POD-RBF) are adopted. The proposed approach is demonstrated through several synthetic numerical examples inspired by the data of real tunnel projects. The developed methods are integrated into a user-friendly application called SMART to serve as a support platform for tunnel engineers at construction sites. Corresponding to each user adjustment of the input parameters, i.e., each TBM driving scenario, approximately two million outputs of soil-structure interactions are quickly predicted and visualized in seconds, which can provide the site engineers with a rough estimation of the impacts of the chosen scenario on structural responses of the tunnel and above ground structures