23 research outputs found

    Le nouveau manuel d histoire franco-allemand

    Get PDF

    Lire l’histoire de Metz avec un regard franco-allemand

    Get PDF
    Colloques. 50e anniversaire du Traité de l’Élysé

    Technology, Safety and Costs of Decommissioning Nuclear Reactors At Multiple-Reactor Stations

    Get PDF
    Safety and cost information is developed for the conceptual decommissioning of large (1175-MWe) pressurized water reactors (PWRs) and large (1155-MWe) boiling water reactors {BWRs) at multiple-reactor stations. Three decommissioning alternatives are studied: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and ENTOMB (entombment). Safety and costs of decommissioning are estimated by determining the impact of probable features of multiple-reactor-station operation that are considered to be unavailable at a single-reactor station, and applying these estimated impacts to the decommissioning costs and radiation doses estimated in previous PWR and BWR decommissioning studies. The multiple-reactor-station features analyzed are: the use of interim onsite nuclear waste storage with later removal to an offsite nuclear waste disposal facility, the use of permanent onsite nuclear waste disposal, the dedication of the site to nuclear power generation, and the provision of centralized services. Five scenarios for decommissioning reactors at a multiple-reactor station are investigated. The number of reactors on a site is assumed to be either four or ten; nuclear waste disposal is varied between immediate offsite disposal, interim onsite storage, and immediate onsite disposal. It is assumed that the decommissioned reactors are not replaced in one scenario but are replaced in the other scenarios. Centralized service facilities are provided in two scenarios but are not provided in the other three. Decommissioning of a PWR or a BWR at a multiple-reactor station probably will be less costly and result in lower radiation doses than decommissioning an identical reactor at a single-reactor station. Regardless of whether the light water reactor being decommissioned is at a single- or multiple-reactor station: • the estimated occupational radiation dose for decommissioning an LWR is lowest for SAFSTOR and highest for DECON • the estimated cost of decommissioning a PWR is lowest for ENTOMB and highest for SAFSTOR • the estimated cost of decommissioning a BWR is lowest for OECON and highest for SAFSTOR. In all cases, SAFSTOR has the lowest occupational radiation dose and the highest cost

    REVIEW OF REACTOR SAFETY ANALYSES OF FAST AND LIQUID METAL COOLED REACTORS

    Full text link
    Safety analysis reports on United States fast and liquid metal cooled reactors were reviewed to gain a better understanding of the safety philosophy applied to the design of these facilities. This information was compiled to help guide the design and safety analysis of the Fast Flux Test Facility. No attempt was made to draw conclusions concerning the relative merit of different approaches and philosophies used by different reactor design teams. The facilities reviewed were; Enrico Fermi Atomic Power Plant (FERMI) Hallam Nuclear Power Facility (HALLAM) Southwest Experimental Fast Oxide Reactor (SEFOR) Fast Reactor Test Facility (FARET) Experimental Breeder Reactor No. 1 (EBR-I) Experimental Breeder Reactor No. 2 (EBR-II) Fast Reactor Zero Power Experiment (ZPR - III). The information gathered from the safety analysis reports is tabulated under these headings: Control and Safety Systems; Reactor Protection Systems; Backup Systems; Containment or Confinement Systems; Inherent Reactivity Effects and Important Physics Parameters; Fuel and Fuel Handling; Accidents Considered and Chemical Problems; Site; Exhaust Ventilation System; and Waste Effluents

    Tell Her She’s Pretty: A Novella

    Get PDF
    63 pages. A thesis presented to the Department of English and the Clark Honors College of the University of Oregon in partial fulfillment of the requirements for degree of Bachelor of Arts, Winter 2015
    corecore