29,427 research outputs found

    Conformal or Walking? Monte Carlo renormalization group studies of SU(3) gauge models with fundamental fermions

    Full text link
    Strongly coupled gauge systems with many fermions are important in many phenomenological models. I use the 2-lattice matching Monte Carlo renormalization group method to study the fixed point structure and critical indexes of SU(3) gauge models with 8 and 12 flavors of fundamental fermions. With an improved renormalization group block transformation I am able to connect the perturbative and confining regimes of the N_f=8 flavor system, thus verifying its QCD-like nature. With N_f=12 flavors the data favor the existence of an infrared fixed point and conformal phase, though the results are also consistent with very slow walking. I measure the anomalous mass dimension in both systems at several gauge couplings and find that they are barely different from the free field value.Comment: 26 pages, 11 figure

    The analysis of barriers to bim implementation for industrialized building construction: a China study

    Get PDF
    The emerging Building Information Modeling (BIM) can better promote the development of building industrialization, with data integration between information-rich building models and business processes. However, the practical implementation of BIM still faces barriers. Existing studies have discussed these barriers extensively, but the research on the barriers to the implementation of BIM amid building industrialization in China is inadequate. In this study, 23 barriers were identified through literature review. A questionnaire survey approach was used to collect data from various parties. Factor analysis methods were used to process and rank barrier factors for BIM applications in the context of industrialized building. Based on the analysis of each factor, analytic hierarchy process was adopted to identify the key barriers to the implementation of BIM for industrialized building construction. The study concluded that the main barriers for BIM implementation for industrialized building were capital-related factors and the lack of support from owners. This study proposes that in addition to governmental policy support for BIM and multi-stakeholder engagement, companies should also organize experts to effectively evaluate the risks of applying BIM. Overall, this study provides suggestions on construction organizational transformations in the roadmap of moving towards digital-driven building industrialization
    • …
    corecore