33 research outputs found

    Beam heat load analysis with COLDDIAG: a cold vacuum chamber for diagnostics

    Get PDF
    The knowledge of the heat intake from the electron beam is essential to design the cryogenic layout of superconducting insertion devices. With the aim of measuring the beam heat load to a cold bore and understanding the responsible mechanisms, a cold vacuum chamber for diagnostics (COLDDIAG) has been built. The instrumentation comprises temperature sensors, pressure gauges, mass spectrometers and retarding field analyzers, which allow to study the beam heat load and the influence of the cryosorbed gas layer. COLDDIAG was installed in the storage ring of the Diamond Light Source from September 2012 to August 2013. During this time measurements were performed for a wide range of machine conditions, employing the various measuring capabilities of the device. Here we report on the analysis of the measured beam heat load, pressure and gas content, as well as the low energy charged particle flux and spectrum as a function of the electron beam parameters

    A superconducting switch for insertion devices with variable period length

    Get PDF
    Superconducting insertion devices (IDs) are very attractive for synchrotron light sources since they offer the possibility to enhance the tuning range and functionality significantly by period length switching. Period length switching can be realized by reversing the current in a separately powered subset of the superconducting windings. So far, the first demonstration mock-up coil allowing period length tripling was fabricated and tested successfully. Here, we report on the feasibility of superconducting switches built to operate in a liquid helium bath and under conduction cooled conditions

    Field quality of 1.5 m long conduction cooled superconducting undulator coils with 20 mm period length

    Get PDF
    The Institute for Beam Physics and Technology (IBPT) at the Karlsruhe Institute of Technology (KIT) and the industrial partner Babcock Noell GmbH (BNG) are collaborating since 2007 on the development of superconducting undulators both for ANKA and low emittance light sources. The first full length device with 15 mm period length has been successfully tested in the ANKA storage ring for one year. The next superconducting undulator has 20 mm period length (SCU20) and is also planned to be installed in the accelerator test facility and synchrotron light source ANKA. The SCU20 1.5 m long coils have been characterized in a conduction cooled horizontal test facility developed at KIT IBPT. Here we present the local magnetic field and field integral measurements, as well as their analysis including the expected photon spectrum

    Characterization and long term operation of a novel superconducting undulator with 15 mm period length in a synchrotron light source

    Get PDF
    A new cryogen-free full scale (1.5 m long) superconducting undulator with a period length of 15 mm (SCU15) has been successfully tested in the ANKA storage ring. This represents a very important milestone in the development of superconducting undulators for third and fourth generation light sources carried on by the collaboration between the Karlsruhe Institute of Technology and the industrial partner Babcock Noell GmbH. SCU15 is the first full length device worldwide that with beam reaches a higher peak field than what expected with the same geometry (vacuum gap and period length) with an ideal cryogenic permanent magnet undulator built with the best material available PrFeB. After a summary on the design and main parameters of the device, we present here the characterization in terms of spectral properties and the long term operation of the SCU15 in the ANKA storage ring
    corecore