    600 a Current Leads with Dry and Compact Warm Terminals

    Get PDF
    For the LHC magnet test benches 26 pairs of conventional helium vapour-cooled 600 A current leads are required. The first pair of 600 A current leads has been designed and built by industry and tested at CERN. The main component of the lead is the heat exchanger, which consists of two concentric copper pipes. Special attention was also given to the design of the warm terminal in order to avoid any condensation and to resist at an electrical test of 2 kV. The paper describes construction details and compares calculated and measured values of the main parameters

    Experience with a Pre-Series Superfluid Helium Test Bench for LHC Magnets

    Get PDF
    The Large Hadron Collider (LHC) under construction at CERN is based on the use of high-field superconducting magnets operating in superfluid helium. For the validation of the machine dipoles and quadrupoles, a magnet test plant is under construction requiring 12 so-called Cryogenic Feeder Units (CFU). Based on experience done at CERN, two pre-series CFUs were designed and built by industry and are currently in use prior to final series delivery. This presentation describes the features of a CFU, its typical characteristics and the experience acquired with the first units

    Cryogenics for the CERN Solar Axion Telescope (CAST) using a LHC Dipole Prototype Magnet

    Get PDF
    The axion, an as yet hypothetical particle predicted from the solution of the strong CP problem, constitutes a prime candidate for the galactic dark matter and also arises in supersymmetry and superstring theories. If existing, axions should be copiously produced in stellar interiors and there are theoretical expectations for a low-energy axion emission spectrum peaked around a mean energy of ~ 4.4 keV. To provide the experimental proof, a solar axion telescope is at present installed at CERN, which is expected to be in total 10-12 times more efficient than the present largest set-up in operation at the University of Tokyo. The telescope will use a decommissioned 10-m long LHC superconducting dipole prototype magnet, providing a magnetic field of 9 T in operation, to catalyse the solar axion to photon conversion, which then can be detected by low-background x-ray detectors. The paper describes the external and proximity cryogenic systems and their integration into the overall telescope assembly

    Baseline Configuration of the Cryogenic System for the International Linear Collider

    Get PDF
    The paper discusses the main constraints and boundary conditions and describes the baseline configuration of the International Linear Collider (ILC) cryogenic system. The cryogenic layout, architecture and the cooling principle are presented. The paper addresses a plan for study and development required to demonstrate and improve the performance, to reduce cost and to attain the desired reliability

    Long Term Stability of the LHC Superconducting Cryodipoles after Outdoor Storage

    Get PDF
    The main superconducting dipoles for the LHC are being stored outdoors for periods from a few weeks to several years after conditioning with dry nitrogen gas. Such a storage before installation in the 27 km circumference tunnel may affect not only the mechanical and cryogenic functionality of the cryodipoles but also their quench and field performance. A dedicated task force was established to study all aspects of long term behaviour of the stored cryodipoles, with particular emphasis on electrical and vacuum integrity, quench training behaviour, magnetic field quality, performance of the thermal insulation, mechanical stability of magnet shape and of the interface between cold mass and cryostat, degradation ofmaterials and welds. In particular, one specifically selected cryodipole stored outdoors for more than one year, was retested at cold. In addition, various tests have been carried out on the cryodipole assembly and on the most critical subcomponents to study aspects such as the hygrothermal behaviour of the supporting system and the possible oxidation of the Multi Layer Insulation reflective films. This paper summarizes the main investigations carried out and their results

    European guideline on IgG4-related digestive disease – UEG and SGF evidence-based recommendations

    Get PDF
    The overall objective of these guidelines is to provide evidence-based recommendations for the diagnosis and management of immunoglobulin G4 (IgG4)-related digestive disease in adults and children. IgG4-related digestive disease can be diagnosed only with a comprehensive work-up that includes histology, organ morphology at imaging, serology, search for other organ involvement, and response to glucocorticoid treatment. Indications for treatment are symptomatic patients with obstructive jaundice, abdominal pain, posterior pancreatic pain, and involvement of extra-pancreatic digestive organs, including IgG4-related cholangitis. Treatment with glucocorticoids should be weight-based and initiated at a dose of 0.6–0.8 mg/kg body weight/day orally (typical starting dose 30-40 mg/day prednisone equivalent) for 1 month to induce remission and then be tapered within two additional months. Response to initial treatment should be assessed at week 2–4 with clinical, biochemical and morphological markers. Maintenance treatment with glucocorticoids should be considered in multi-organ disease or history of relapse. If there is no change in disease activity and burden within 3 months, the diagnosis should be reconsidered. If the disease relapsed during the 3 months of treatment, immunosuppressive drugs should be added
    • …