17 research outputs found

    Prevalence of dementia in the Torres Strait

    No full text
    Objective: To examine the prevalence of dementia and problems associated with ageing in the Torres Strait. Methods: The study was conducted across all 18 island and 5 mainland communities in the Torres Strait and Northern Peninsula Area of Far North Queensland. Participants underwent a comprehensive health assessment and a Geriatrician assessment, which were used to establish consensus diagnoses. Results: A total of 276 Torres Strait residents aged between 45 and 93 participated in the study. The prevalence of dementia in the sample was 14.2%, which was 2.87 times higher than the wider Australian population. Conclusion: Torres Strait Islander peoples share the increased risk of dementia seen in Aboriginal Australians compared to the wider community. This highlights the need for interventions to address this increased dementia risk for Aboriginal and Torres Strait Islander communities

    Building information modeling in construction conflict management

    Get PDF
    Dispute is recognized as critical cause of deficiency and low performance in construction projects. Plenty of studies have been done in construction dispute management recently; however, there are no studies on construction dispute elimination. This study aims to propose a building information modeling (BIM) approach to control conflict causes before the occurrenc e of dispute. BIM is one of the latest platforms that promote a high level of collaboration, information sharing, and coordination where its implementation ranges from project initialization to completion stage. The circumstances associating with BIM technology can be utilized to explore the possibilities in conflict and dispute resolution system. Questionnaire surveys are used to collect the primary data. Analytical hierarchy process (AHP) and multi attribute utility technique (MAUT) are adopted to develop an algorithm and a decision-making framework to manage and resolve the potential conflict causes, particularly for the Malaysian construction industry. Data analysis emerged that five critical conflict factors in Malaysian construction industry are insufficient monitoring of CPM scheduling and updates requirements; failures to understand and correctly bid or price the works; delay in running bill payment; inadequate contractors’ management, supervision, and coordination; and error and omission in design that are originated from time, cost, quality, and documentation. Further analysis to prioritize BIM functions in construction conflict management has been done by the combination of AHP and MAUT results. Consequently, it is affirmed that clash detection and cost estimating, 4D scheduling, 3D visualization and structure analysis as BIM functions obtained the highest score to control conflicting factors
    corecore