1,505 research outputs found

    Behaviour of the potentials due to strangeness degree of freedom in ΛΛ6_{\Lambda\Lambda}^6He hypernucleus

    Full text link
    Fully correlated study of ΛΛ6_{\Lambda\Lambda} ^6He hypernucleus has been performed with two- and three- baryon potentials. For the S=-2 sector, various simulations of Nijmegen ΛΛ\Lambda\Lambda potential models have been used. We investigate the role of every strength of the strange sector potentials on the energy breakdown and present a crystal clear understanding of their interplay. Consistency between Λ5_\Lambda ^5He and ΛΛ6_{\Lambda\Lambda}^6He depends on the ΛN\Lambda N space-exchange strength only. Investigation limits the strength of simulated Nijmegen ΛΛ\Lambda\Lambda potential models. The study is a step forward to determine all the strengths, to reslove A=5 anomaly and to search for ΛΛ4_{\Lambda\Lambda}^4H in an authentic way.Comment: 4 pages, 1 figur

    The effect of uncertainty in whole building simulation models for purposes of generating control strategies

    Get PDF
    Buildings consume a significant amount of energy worldwide in maintaining comfort for occupants. Building energy management systems (BEMS) are employed to ensure that the energy consumed is used efficiently. However these systems often do not adequately perform in minimising energy use. This is due to a number of reasons, including poor configuration or a lack of information such as being able to anticipate changes in weather conditions. We are now at the stage that building behaviour can be simulated, whereby simulation tools can be used to predict building conditions, and therefore enable buildings to use energy more efficiently, when integrated with BEMS. What is required though, is an accurate model of the building which can effectively represent the building processes, for building simulation. Building information modelling (BIM) is a relatively new method of representing building models, however there still remains the issue of data translation between a BIM and simulation model, which requires calibration with a measured set of data. If there a lack of information or a poor translation, a level of uncertaintly is introduced which can affect the simulation’s ability to accurate predict control strategies for BEMS. This paper explores effects of uncertainty, by making assumptions on a building model due to a lack of information. It will be shown that building model calibration as a method of addressing uncertainty is no substitute for a well defined model
    corecore