5 research outputs found

    Assessing the Duration of the Lead Appointed Party Coordination Tasks and Evaluating the Appropriate Team Composition on BIM Projects

    Full text link
    This paper addresses critical success factors for the delivery of BIM projects. The lack of experience with BIM projects on both the demand and supply side often leads to insufficient project teams, unsatisfied clients, schedule, and cost overruns. In order to better structure and control the information delivery in BIM projects requirements, planning and delivery must be standardized. The latter was achieved by EIR (Exchange Information Requirements), new BIM roles, BEP (BIM Execution Plan), and specified digital handover, which must be supported by a common data environment (CDE). This paper provides an analysis of the characteristics of BIM project delivery and duration in Architectural and Engineering companies in Slovakia. The analysis is based on the web survey of BIM managers and coordinators, which reveals that a significant amount of BIM project efforts must be executed by BIM specialists. The results also graphically depict the scope of critical BIM activities across project phases. The presented study is relevant for various project stakeholders and allows for a deeper understanding of the resources needed for the successful delivery of BIM projects in terms of adequate project team capacity, capability, organization, and planning

    Verification of Building Structures Using Point Clouds and Building Information Models

    No full text
    The effort towards automation of the building industry processes has increased significantly over the last years worldwide. One of the key tools in this process is the modeling of buildings using Building Information Modeling (BIM). When following fundamental principles, a BIM model serves as an up-to-date pool of information. Combining the results of effective spatial data collection techniques with the information from a BIM model, it is possible to increase the effectiveness of as-built documentation of the structures or in-site clash detection between the built and planned parts. In this paper, we describe an approach for the verification of building structures by comparing the as-built model created from point clouds with the as-planned model of the building. The point clouds can be collected by laser scanning or photogrammetry, while the geometry of the planned (designed) structures is derived from the BIM model in the Industry Foundation Classes (IFC) format. The advantage of the approach is that the as-built model is created by regression models from point clouds preprocessed by detailed segmentation. The deviations from the design and the relative geometry (e.g., flatness) of the elements are expressed by signed color maps. The presented workflow enables semi-automated verification of building structures

    Verification of Building Structures Using Point Clouds and Building Information Models

    No full text
    The effort towards automation of the building industry processes has increased significantly over the last years worldwide. One of the key tools in this process is the modeling of buildings using Building Information Modeling (BIM). When following fundamental principles, a BIM model serves as an up-to-date pool of information. Combining the results of effective spatial data collection techniques with the information from a BIM model, it is possible to increase the effectiveness of as-built documentation of the structures or in-site clash detection between the built and planned parts. In this paper, we describe an approach for the verification of building structures by comparing the as-built model created from point clouds with the as-planned model of the building. The point clouds can be collected by laser scanning or photogrammetry, while the geometry of the planned (designed) structures is derived from the BIM model in the Industry Foundation Classes (IFC) format. The advantage of the approach is that the as-built model is created by regression models from point clouds preprocessed by detailed segmentation. The deviations from the design and the relative geometry (e.g., flatness) of the elements are expressed by signed color maps. The presented workflow enables semi-automated verification of building structures

    Assessing the Duration of the Lead Appointed Party Coordination Tasks and Evaluating the Appropriate Team Composition on BIM Projects

    No full text
    This paper addresses critical success factors for the delivery of BIM projects. The lack of experience with BIM projects on both the demand and supply side often leads to insufficient project teams, unsatisfied clients, schedule, and cost overruns. In order to better structure and control the information delivery in BIM projects requirements, planning and delivery must be standardized. The latter was achieved by EIR (Exchange Information Requirements), new BIM roles, BEP (BIM Execution Plan), and specified digital handover, which must be supported by a common data environment (CDE). This paper provides an analysis of the characteristics of BIM project delivery and duration in Architectural and Engineering companies in Slovakia. The analysis is based on the web survey of BIM managers and coordinators, which reveals that a significant amount of BIM project efforts must be executed by BIM specialists. The results also graphically depict the scope of critical BIM activities across project phases. The presented study is relevant for various project stakeholders and allows for a deeper understanding of the resources needed for the successful delivery of BIM projects in terms of adequate project team capacity, capability, organization, and planning

    BIM in the center of digital transformation of the construction sector—the status of BIM adoption in North Macedonia

    Full text link
    The building sector nowadays has come to the stage where it needs a “digital” renovation. This is to be accomplished by an introduction of change into the methodology of construction and using new tools and technologies, such as BIM technology. This paper gives an insight into the status of BIM adoption in North Macedonia. It presents the threefold actions toward introduction of BIM in the national construction industry. These actions refer to scanning the current situation regarding digitalization of the sector, then taking promotional actions to express the benefits of BIM, and finally identifying and proposing the most suitable measures, summarized in the proposal of the National Roadmap for BIM adoption. The methods used consist of a brief literature review of the global status of BIM development. Then, the results of a survey conducted on more than 300 respondents representing a sample of building professionals in the country are discussed, and the barriers for successful BIM adoption are accordingly identified. The next step is to showcase the potential benefits of BIM for assessment of energy performance of buildings. As a final point, the conclusions drafted toward identification of the most important challenges are addressed in the proposed National Roadmap for BIM adoption
    corecore