143 research outputs found
Short, Multineedle Frequency Domain Reflectometry Sensor Suitable for Measuring Soil Water Content
Time domain reflectometry (TDR) is a well-established electromagnetic technique used to measure soil water content. Time domain reflectometry sensors have been combined with heat pulse sensors to produce thermo-TDR sensors. Thermo-TDR sensors are restricted to having relatively short needles to accurately measure soil thermal properties. Short needle lengths, however, can limit the accuracy of the TDR measurement of soil water content. Frequency domain reflectometry (FDR) sensors are an alternative to TDR sensors that can provide an inexpensive measurement of soil water content. The objective of this study was to determine whether short FDR sensors can accurately measure soil water content. We designed and constructed a short FDR sensor. For four soil types across a range of water contents, temperatures, and salt contents, we measured soil dielectric spectra with the short FDR sensor. A vector network analyzer was used to obtain soil dielectric spectra in the 1-MHz to 3-GHz frequency range. The ideal frequency of a short FDR sensor is the frequency at which the permittivity is not altered by changing temperature or salt content. The 47- to 200-MHz range was an ideal frequency range for measuring soil water content, and 70 MHz was the frequency least influenced by temperature and salt content. The short FDR sensor provided quick, continuous, stable, and cheap measurements of soil water content. Because of the promising performance of the short thermo-FDR sensor in laboratory studies, sensors should be evaluated in future field studies
Site investigation for the effects of vegetation on ground stability
The procedure for geotechnical site investigation is well established but little attention is currently given to investigating the potential of vegetation to assist with ground stability. This paper describes how routine investigation procedures may be adapted to consider the effects of the vegetation. It is recommended that the major part of the vegetation investigation is carried out, at relatively low cost, during the preliminary (desk) study phase of the investigation when there is maximum flexibility to take account of findings in the proposed design and construction. The techniques available for investigation of the effects of vegetation are reviewed and references provided for further consideration. As for general geotechnical investigation work, it is important that a balance of effort is maintained in the vegetation investigation between (a) site characterisation (defining and identifying the existing and proposed vegetation to suit the site and ground conditions), (b) testing (in-situ and laboratory testing of the vegetation and root systems to provide design parameters) and (c) modelling (to analyse the vegetation effects)
- …