1 research outputs found

    PENERAPAN METODE POKA YOKE DALAM PROSES PENYORTIRAN BAJU BLAZER DI CV IM PROJECT

    Get PDF
    The Poka Yoke method process is used to prevent simple mistakes made by human labor. CV Im Project is an online shop engaged in the stripping clothing industry which will be marketed on the online marketplace, Im Project located at Graha Puspa. In this study, Quality Control (QC) was carried out, which had the responsibility of selecting goods according to selling quality standards, then researchers analyzed and looked for errors that often occur in the CV Im Project. After several errors were found, such as stubborn stains, torn croton, color transfer and holes, only the front and back were seen. Less effective because double sorting results in a waste of time so there are still many defects in the blazer. The next step is for researchers to look for alternative solutions to errors that occur using the Poka Yoke method. The findings from this study are that the previous Quality Control process was not thorough, so many blazers are still not available for sale. And there are still many problems that will occur or may occur. With all these problems a negative impact on the Im Project industry. The purpose of this research is expected to be the initial solution for sorting blazers according to market standards. Based on the results that have been obtained in this study, namely defects in blazers are better than before with fewer defects and are corrected. The poka yoke method yields effective results and provides suggestions to the CV Im Procect industry to make mistakes and control the quality of goods.Proses metode Poka Yoke digunakan untuk mencegah kesalahan sederhana yang dilakukan oleh tenaga manusia. CV Im Project merupakan salah satu online shop yang bergerak di bidang industri baju sthrifting yang akan di pasarkan di marketplace online, Im Project  berlokasi di Graha Puspa. Dalam penelitian ini dilakukan adanya Quality Control (QC) yang memiliki tanggungjawab memilih barang sesuai dengan standar kualitas jual, kemudian peneliti menganalisis dan mencari kesalahan yang sering terjadi di CV Im Project. Setelah ditemukan beberapa kesalahan seperti noda membandel, puring robek, transfer warna dan bolong yang dilihat hanya tampak depan dan belakang. Kurang efektif karena double sortir mengakibatkan pemborosan waktu sehingga masih banyak cacat yang ada pada baju blazer. Langkah selanjutnya peneliti mencari alternatif pemecahan kesalahan yang terjadi dengan menggunakan metode Poka Yoke. Temuan dari penelitian ini bahwa proses Quality Control yang sebelumnya kurang teliti, sehingga banyak baju blazer yang masih kurang untuk dijual belikan. Dan masih banyak permasalahn yang akan terjadi atau mungkin terjadi. Dengan semua permasalahan tersebut memberikan dampak negatif bagi industri Im Project. Tujuan dari penelitian ini diharapkan bisa menjadi solusi awal untuk mensortir baju blazer sesuai standar pasar. Berdasarkan hasil yang telah diperoleh penelitian ini yaitu kecacatan pada baju blazer lebih baik dari sebelumnya dengan kecacatan yang sedikit dan diperbaiki. Metode poka yoke didapatkan hasil yang efektif dan memberikan usulan kepada industri CV Im Project untuk melakukan kesalahan serta pengendalian kualitas barang
    corecore