51 research outputs found
Bridge distress caused by approach embankment settlement
Surtees Bridge, which carries the A66(T) over the River
Tees near Thornaby-on-Tees in the UK, has been
showing signs of distress that predate its opening in
1981. Subsequent investigations have shown that the
bridge distress is related to unexpectedly large
settlement of the eastern approach embankment.
Recent ground investigations prompted by a proposed
widening of the river crossing have produced many new
data on the alluvial deposits underlying the site, and
explain why embankment settlement was so much larger
than originally anticipated. Comparison of the
geotechnical parameters obtained from the original and
more recent ground investigations suggests that the
original investigation significantly underestimated the
thickness of an alluvial clay layer underlying the site, and
that its coefficient of consolidation was overestimated.
Settlement analyses using geotechnical data from the
original ground investigations predict moderate
embankment settlements occurring principally during
construction. Settlement analyses based on all the
available data predict far larger embankment
settlements occurring over extended time periods. The
latter analyses predict an embankment settlement
similar to that observed and of sufficient magnitude to
cause the observed lateral displacement of the bridge
due to lateral loading of its piled foundation
- …