2 research outputs found

    ANALISIS PERANCANGAN USAHA PEMBUATAN PENIRIS MINYAK (SPINNER) SEDERHANA UNTUK UMKM

    Get PDF
    Indonesian people, especially the lower middle class, often survive by establishing MSMEs or Micro, Small and Medium Enterprises because in building MSMEs (Micro, Small and Medium Enterprises) does not require large capital and can be done in the owner's home, our research aims to ease the burden of capital or business from chip-making business owners on a small or micro scale so that business owners do not spend too much money when buying equipment, Our research focuses on the quality and durability of the products to be sold and the result of our research is to make an oil draining machine (spinner) with small dimensions and at a low price but with quality that is not cheap, after going through various cost analyses, we get a price for the sale of our machine which is Rp. 260,000.00 / unit., with an affordable price, a machine that has been made from foodgrade and powerful to drain the oil in the chips that have been frie

    Analisis Risiko Kecelakaan Kerja pada De-Pilling Machine After Autoclave Menggunakan Metode JSA dan Pengontrolan Risiko Menggunakan Metode HIRARC pada PT.XXX

    No full text
    PT XXX is one of the companies engaged in goods, more precisely the manufacture of fiber cement boards and wave boards. Every product that will be marketed will be packaged where the packaging is done in the De-pilling Machine after Autoclave (DMA) area. Not all DMA machines run automatically and are run by one person, there are still DMA machines that run manually, which still require the help of human labor, because when working in manual DMA the risk is great and is done by several people, so in this area risk analysis, risk identification, risk level determination, risk control and handling are needed as an effort to improve Occupational Health and Safety (K3). The method to be used is the Job Safety Analysis (JSA) method because this method focuses on identifying hazards in the work, then the hazards will be controlled by the Hazard Identification And Risk Control (HIRARC) method. From the analysis using the JSA method, 8 jobs were found to be at risk with an average risk level of Medium - High so risk control is needed for these 8 jobs. The work will be analyzed for hazards and controlled risks, the goal is to know the magnitude of the risk of work and prioritize controlling which jobs have the most significant risk and if possible, replace machines that are still manual with automatic machines to be more efficient, reduce risk and do not require many people
    corecore