2 research outputs found

    Scape Ore Swamp Nonpoint Source Assessment Project: Load Reduction Management Plan

    Get PDF
    The federal Clean Water Act (CWA) directs each state to review the quality of its waters every two years to determine if water quality standards are being met. A Total Maximum Daily Load (TMDL) is a written plan and analysis to determine the maximum pollutant load a waterbody can receive and still meet applicable water quality standards. This Load Reduction Management Plan details Fecal Coliform Bacteria for the impaired sections of Scape Ore Swamp: Station PD-355

    Fecal Coliform TMDL and Load Reduction Management Plan: Big Swamp, South Carolina

    Get PDF
    The federal Clean Water Act (CWA) directs each state to review the quality of its waters every two years to determine if water quality standards are being met. A Total Maximum Daily Load (TMDL) is a written plan and analysis to determine the maximum pollutant load a waterbody can receive and still meet applicable water quality standards. This document details Fecal Coliform TMDL and Load Reduction Management Plan for Big Swamp, South Carolina
    corecore