    Probabilistic Duration Estimation Model for High-Rise Structural Work

    Get PDF
    The duration of a construction project is a key factor to consider before starting a new project, as it can determine project success or failure. Despite the high level of uncertainty and risk involved in construction, current construction planning relies on traditional deterministic scheduling methods that cannot clearly ascertain the level of uncertainty involved in a project. This, subsequently, can prolong a project`s duration, particularly when that project is high-rise structural work, which is not yet a common project type in Korea. Indeed, among construction processes, structural work is notable, as it is basically performed outdoors. Thus, no matter how precisely a schedule is developed, such projects can easily fail due to unexpected events that are beyond the planner`s control, such as changes in weather conditions. Therefore, in this study, to cope with the uncertainties involved in high-rise building projects, a probabilistic duration estimation model is developed in which both weather conditions and work cycle time for unit work are considered to predict structural work duration. According to the proposed estimation model, weather variables are divided into two types: weather conditions that result in nonworking days and weather conditions that result in work productivity rate (WPR) change. Obtained from actual previous data, the WPR is used with relevant nonworking day weather conditions to modify the actual number of working days per calendar days. Furthermore, on the basis of previous research results, the cycle time of the unit work area is assumed to follow the beta probability distribution function. Thus, the probabilistic duration model is valid for 95% probability. Finally, a case study is conducted that confirms the model can be practically used to estimate more reliable and applicable probabilistic durations of structural work. Indeed, this model can assist schedulers and site workers by alerting them, at the beginning of a project, to project uncertainties that specifically pertain to structural work and the weather. Thus, the proposed model can enable personnel to easily amend, and increase the reliability of, the construction schedule at hand.

    Comparative Interactomes of VRK1 and VRK3 with Their Distinct Roles in the Cell Cycle of Liver Cancer

    Get PDF
    Vaccinia-related kinase 1 (VRK1) and VRK3 are members of the VRK family of serine/threonine kinases and are principally localized in the nucleus. Despite the crucial roles of VRK1/VRK3 in physiology and disease, the molecular and functional interactions of VRK1/VRK3 are poorly understood. Here, we identified over 200 unreported VRK1/VRK3-interacting candidate proteins by affinity purification and LC-MS/MS. The networks of VRK1 and VRK3 interactomes were found to be associated with important biological processes such as the cell cycle, DNA repair, chromatin assembly, and RNA processing. Interactions of interacting proteins with VRK1/VRK3 were confirmed by biochemical assays. We also found that phosphorylations of XRCC5 were regulated by both VRK1/VRK3, and that of CCNB1 was regulated by VRK3. In liver cancer cells and tissues, VRK1/VRK3 were highly upregulated and its depletion affected cell cycle progression in the different phases. VRK3 seemed to affect S phase progression and G2 or M phase entry and exit, whereas VRK1 affects G1/S transition in the liver cancer, which could be explained by different interacting candidate proteins. Thus, this study not only provides a resource for investigating the unidentified functions of VRK1/VRK3, but also an insight into the regulatory roles of VRK1/VRK3 in biological processes.11Ysciescopuskc

    Transaction-Cost-Based Selection of Appropriate General Contractor-Subcontractor Relationship Type

    Get PDF
    Relationships between general contractors and subcontractors are generally formed on a project-by-project basis. However, because of the competitive nature of the construction industry, this traditional arrangement can result in adversarial relationships between general contractors and subcontractors, which can jeopardize potential or ongoing collaborative construction plans. To avoid this problem, close, long-term relationships between general contractors and subcontractors, as in strategic partnerships, must be established. Unfortunately, forming and sustaining such relationships can be time-consuming and cost-intensive. Furthermore, this type of relationship does not necessarily enhance cooperation or work performance. For contractors to successfully establish effective partnerships with their subcontractors, they must select the appropriate relationship by considering the different characteristics of the subcontracted work involved. Based on transaction cost theory, the findings of this study show that transaction costs incurred by general contractors and subcontractors vary according to the type of relationship established. Therefore, for the purpose of comparing transaction costs incurred in both competitive and partnership relationships, transaction-cost-based profit models for both general contractors and subcontractors are developed, respectively, for each relationship type. As well, by applying different strategies to maximize profits in each relationship, and by simulating the parameters affecting the nature of the subcontracted work, the conditions and relationships under which general contractors` profits are optimized have been determined. Finally, based on simulation, practical guidelines for choosing the most appropriate relationship type are proposed.

    A Typology Model of Temporary Facility Constraints for Automated Construction Site Layout Planning

    No full text
    This study sought to develop a typology model of temporary facility constraints that can be used practically in construction site layout planning (CSLP) automation models. A triangulated methodology (literature review, in-depth interviews, and actual case studies) was used to identify constraints of 11 temporary facilities that are considered mainly in CSLP and to classify them into six constraint types (i.e., dimensional, regional, relocation, non-overlap, inter-facility distance, and visibility constraints) and seven subtypes. In addition, this study proposed computational modeling methods that would allow a computer to judge whether or not the constraints are met by a created construction site layout. This study contributes to CSLP theory by providing a typology model of temporary facilities that can be used in the model-based verification of the created construction site layout and constraint processing condition in CSLP optimization models. This would also help provide efficient, safe, and eco-friendly construction site management, while refraining from experience- and intuition-centered CSLP practices

    Optimal option selection for finishing works of high-rise building

    No full text
    Time-Cost Trade-Off Problem (TCTP), to determine optimal option among many options of construction work of high-rise building, is an issue that needs to be addressed to optimize construction duration with minimal cost. Despite the fact that the crashing process entailed in a network scheduling method is not suitable for the repetitive activities of a construction project, traditional time-cost trade-off focuses on the techniques for minimizing construction cost and time in a network-based scheduling method. In addition, time-cost relationships are usually presumed to be linear, not nonlinear. Since only integer durations (days) are considered in construction scheduling, linear approximation is not fully suitable to solve the TCTP. Thus, time-cost relationships need to be redefined at discrete points representing time-cost options. In addition, Tact scheduling is one of the most useful scheduling methods to reflect the repetitiveness usually demonstrated in a LOB (Line of Balance) form. However, Tact scheduling requires too much time and effort to determine Tact time, options (cost and time of activity), and the group of activities with the same option. Genetic Algorithms (GAs) are efficient in searching for optimal solutions among decision alternatives. Thus, the authors propose a time-cost trade-off method of Tact scheduling that uses GAs.This research was supported by a grant (05CIT-D05-01) from Construction Technology Innovation Program funded by Ministry of Land, Transport and Maritime Affairs of Korean government.

    c-Abl Regulates the Pathological Deposition of TDP-43 via Tyrosine 43 Phosphorylation

    No full text
    Non-receptor tyrosine kinase, c-Abl plays a role in the pathogenesis of several neurodegenerative disorders such as Alzheimer’s disease and Parkinson’s disease. Here, we found that TDP-43, which was one of the main proteins comprising pathological deposits in amyotrophic lateral sclerosis (ALS), is a novel substrate for c-Abl. The phosphorylation of tyrosine 43 of TDP-43 by c-Abl led to increased TDP-43 levels in the cytoplasm and increased the formation of G3BP1-positive stress granules in SH-SY5Y cells. The kinase-dead mutant of c-Abl had no effect on the cytoplasmic localization of TDP-43. The expression of phosphor-mimetic mutant Y43E of TDP-43 in primary cortical neurons accumulated the neurite granule. Furthermore, the phosphorylation of TDP-43 at tyrosine 43 by c-Abl promoted the aggregation of TDP-43 and increased neuronal cell death in primary cortical neurons, but not in c-Abl–deficient primary cortical neurons. Identification of c-Abl as the kinase of TDP43 provides new insight into the pathogenesis of ALS

    Automated identification of thrombectomy amenable vessel occlusion on computed tomography angiography using deep learning

    Get PDF
    IntroductionWe developed and externally validated a fully automated algorithm using deep learning to detect large vessel occlusion (LVO) in computed tomography angiography (CTA).MethodA total of 2,045 patients with acute ischemic stroke who underwent CTA were included in the development of our model. We validated the algorithm using two separate external datasets: one with 64 patients (external 1) and another with 313 patients (external 2), with ischemic stroke. In the context of current clinical practice, thrombectomy amenable vessel occlusion (TAVO) was defined as an occlusion in the intracranial internal carotid artery (ICA), or in the M1 or M2 segment of the middle cerebral artery (MCA). We employed the U-Net for vessel segmentation on the maximum intensity projection images, followed by the application of the EfficientNetV2 to predict TAVO. The algorithm’s diagnostic performance was evaluated by calculating the area under the receiver operating characteristics curve (AUC), sensitivity, specificity, positive predictive value (PPV), and negative predictive value (NPV).ResultsThe mean age in the training and validation dataset was 68.7 ± 12.6; 56.3% of participants were men, and 18.0% had TAVO. The algorithm achieved AUC of 0.950 (95% CI, 0.915–0.971) in the internal test. For the external datasets 1 and 2, the AUCs were 0.970 (0.897–0.997) and 0.971 (0.924–0.990), respectively. With a fixed sensitivity of 0.900, the specificities and PPVs for the internal test, external test 1, and external test 2 were 0.891, 0.796, and 0.930, and 0.665, 0.583, and 0.667, respectively. The algorithm demonstrated a sensitivity and specificity of approximately 0.95 in both internal and external datasets, specifically for cases involving intracranial ICA or M1-MCA occlusion. However, the diagnostic performance was somewhat reduced for isolated M2-MCA occlusion; the AUC for the internal and combined external datasets were 0.903 (0.812–0.944) and 0.916 (0.816–0.963), respectively.ConclusionWe developed and externally validated a fully automated algorithm that identifies TAVO. Further research is needed to evaluate its effectiveness in real-world clinical settings. This validated algorithm has the potential to assist early-career physicians, thereby streamlining the treatment process for patients who can benefit from endovascular treatment
    corecore