1 research outputs found

    Redesign Foundation Of Crown Project Cikarang With Precast Prestressed Slab On Gorund And Machine Foundation

    Get PDF
    This Crown Factory project is located in a good soil. Therefore, it will be easier to design with precast prestressed slabs on grade. The design includes the thickness of slabs and the needed prestressed post-tensioned tendon and reinforcement. The precast panel will be evaluated partly; it means each panel won’t influence another panel. So, every panel will be connected with contraction joint and silien as a glue connector. Because of that, this slab is considered as secondary structure. Hence, it’s a needed to design structural foundation as part of resisting external forces such as earthquake, wind, and rain. The structural foundation includes reinforcement pile cap and pile. Not only the design, this final thesis project also identifies the appropriate precast erection method, especially for slab, and calculating the loss of prestressed that occurs from the erection. Furthermore, this thesis will be analyzed the foundation of machine that considered as dynamic foundation. The design will includes calculating of pile cap and pile
    corecore