28,679 research outputs found

    2014 ACSSC Program

    Get PDF

    2013 ACSSC Program

    Get PDF

    2011 ACSSC Program

    Get PDF

    Pilot Conservation Commission Circuit Rider Program

    Get PDF
    The purpose of this pilot project was to increase the effectiveness of the three Conservation Commissions in the Exeter River watershed. The Towns of Kensington, Kingston, and Sandown were selected based on their interest in the program and their need for professional planning assistance. Rockingham Planning Commission staff attended monthly meetings of each Conservation Commission to discuss and implement short-term and long-term projects. The three Conservation Commissions selected two natural resource protection projects to work on with RPC assistance. The scope of these projects ranged from very basic, such as establishing a process for record keeping in Kingston, to more advanced, such as indepth discussions on protecting wildlife habitat in Kensington and development of several land use regulations in Sandown. With just several hours of professional assistance each month, each Commission was able to complete projects that will increase their community’s ability to protect natural resources

    2010 ACSSC Program

    Get PDF

    Town of New Durham Zoning & Land Use Odinance

    Get PDF
    The surface waters (streams, rivers, lakes and ponds) and wetlands of New Durham supply drinking water, wildlife habitat, and recreation opportunities for the community. In order to preserve these critically important resources New Durham shall require conservation and land management practices which minimize environmental degradation and alteration of scenic and rural character

    PUCM Practice Development Programme (PDP): February 2005

    Get PDF
    The purpose of this report is to identify a Practice Development Programme (PDP) for the presentation of relevant innovative practices and tools arising out of the first two Phases of PUCM (Planning Under Co-operative Mandates). During Phase 3 of the research (2004-2006) the PDP will be extended as new findings come to hand

    UCL (University College London) Libraries Masterplan: Masterplanning Report

    Get PDF
    BDP were appointed to undertake a Masterplan for the UCL Main Library and the UCL Science Library and to identify how these buildings could be re-ordered to significantly improve the quality of the library environment and to facilitate the delivery of library services. An initial brief was agreed with UCL’s Estates Management Committee and a Masterplan Steering Group established including academic representatives, library staff and design consultants. To inform the development of this brief, UCL Library Services undertook a number of consultation exercises with users of the Library; students, academic staff and external users, together with Library staff. A number of visits to exemplar library buildings in the UK and continental Europe were also undertaken to inform the development of options for the buildings. Following the development and review of initial options for both the Main Library and Science Library, it was agreed a further, hypothetical New Build Central Library Option should be reviewed, to accommodate a relocated and consolidated library service encompassing 7 of the 16 existing libraries currently distributed across the UCL Estate
    corecore