3 research outputs found

    Combined current and wind simulation for floating offshore wind turbines

    Get PDF
    This paper describes the validation of a novel method to simulate current loading on a floating offshore wind turbine model. A dynamic winch actuator is used to emulate the drag force of current on the platform of the model with a Software in the Loop application. Current loads are combined with wave- and wind loads. The results of experiments with physical current are validated against the results of experiments with simulated current. A method to simulate wave-current interactions is also described. The results show that the winch actuator can reliably emulate current induced drag forces in comparison with physical current under various combinations of environmental loads. Experimental repeatability of the response of the platform is shown to be superior when using simulated- rather than physical current

    Access to a floating wind turbine

    Get PDF
    The offshore wind turbine service industry is now well established with a large number of turbines being successfully operated and maintained. A number of methods and technologies are available to allow the safe transfer of service crews to these primarily fixed monopile installations. The most common of these is the bow transfer method which uses a combination of a high friction fender and a large vessel thrust to minimise relative motion between the bow and the turbine foundation. An upcoming challenge for the offshore wind turbine service industry will be the increasing use of floating foundations in far offshore and deep water sites. A number of structures are currently being developed and the first commercial floating wind farm is expected to be commissioned in late 2017. The use of floating structures will make it more difficult to ensure crew safety and comfort during transfer operations as the interaction between two floating bodies needs to be considered. Thus, the bow transfer method used to access fixed foundations may not be suitable for accessing floating turbine platforms. This paper will use a combination of physical and numerical modelling to assess the ability of a wind farm service vessel to maintain contact with a floating offshore wind turbine structure by use of the bow transfer method

    Access to a floating wind turbine

    No full text
    The offshore wind turbine service industry is now well established with a large number of turbines being successfully operated and maintained. A number of methods and technologies are available to allow the safe transfer of service crews to these primarily fixed monopile installations. The most common of these is the bow transfer method which uses a combination of a high friction fender and a large vessel thrust to minimise relative motion between the bow and the turbine foundation. An upcoming challenge for the offshore wind turbine service industry will be the increasing use of floating foundations in far offshore and deep water sites. A number of structures are currently being developed and the first commercial floating wind farm is expected to be commissioned in late 2017. The use of floating structures will make it more difficult to ensure crew safety and comfort during transfer operations as the interaction between two floating bodies needs to be considered. Thus, the bow transfer method used to access fixed foundations may not be suitable for accessing floating turbine platforms. This paper will use a combination of physical and numerical modelling to assess the ability of a wind farm service vessel to maintain contact with a floating offshore wind turbine structure by use of the bow transfer method
    corecore