1 research outputs found

    Technical Design Report for the Upgrade of the ALICE Time Projection Chamber

    Get PDF
    An interaction rate of 50 kHz is expected for the Pb-Pb periods after the luminosity upgrade of the LHC during LS2, and the ALICE upgrade plans foresee to operate the experiment at these interaction rates. For this purpose, the MWPC-based TPC readout chambers will be replaced by Gas Electron Multipliers (GEMs), allowing a continuous readout of the TPC. The details of this upgrade are described in this Technical Design Report
    corecore