    Pre-conceptual Design Assessment of DEMO Remote Maintenance

    Full text link
    EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally valuable in communicating the complexity and scale of the required operations. Through these simulations, estimates of the maintenance task durations have been possible demonstrating that a full replacement of the blankets within 6 months could be achieved. The design of the first wall, including the need to use sacrificial limiters must still be investigated. In support of the maintenance operations, a first indication of the requirements of an Active Maintenance Facility (AMF) has been elaborated.Comment: 6 pages, 5 figure

    Efficient Thrust Bearing Model for High-Speed Rotordynamic Applications

    No full text

    Mechanical characteristics of a thrust magnetic bearing

    No full text
    corecore