14 research outputs found
The role of the GPS-system in integrated control system skylines in mine for copper Bucim
With the hastily ascent of the techniques at the end of 20th century, the role of the GPS systems rapidly
increases in all fields of technologies prevalent on the surface layer and hence in open-cut mining.
All tippers and dredgers are equipped with GPS receiver, so both the dispatcher and employer can have
information about the current position of the machines.
In this article are described part of the GPS receiver, the integration in the Skylines and part of the reports
Synchronization of overburden dumping in Bucim open pit mine in function of minimal costs
Overburden exploatation in open pit βBucimβ is performed from 3 (three) ore bodies, with least 2 (two)
excavating zone. Overburden dumping is in 3 dump: two external and one internal. The need for
synchronization of work is imminent, given that it is the same transport machinery - 12 trucks.
In this paper it was made an attempt for mathematical modeling of synchronization of transporting and
overburden dumping in three dumps
ΠΠΎΠ²Π΅ΡΠ΅ΠΊΡΠΈΡΠ΅ΡΠΈΡΠΌΡΠΊΠ° Π°Π½Π°Π»ΠΈΠ·Π° Π·Π° ΠΈΠ·Π±ΠΎΡ Π½Π° ΠΎΠΏΡΠΈΠΌΠ°Π»Π΅Π½ Π²ΠΈΠ΄ Π½Π° Π΄Π°ΠΌΠΏΠ΅Ρ Π·Π° ΡΡΠ»ΠΎΠ²ΠΈ Π²ΠΎ ΡΡΠ΄Π½ΠΈΠΊΠΎΡ βΠΡΡΠΈΠΌβ
ΠΠΎ ΡΡΡΠ΄ΠΎΡ Π΅ ΠΏΡΠ΅Π·Π΅Π½ΡΠΈΡΠ°Π½ ΠΈΠ·Π±ΠΎΡΠΎΡ Π½Π° ΠΎΠΏΡΠΈΠΌΠ°Π»Π΅Π½ Π²ΠΈΠ΄ Π½Π° Π΄Π°ΠΌΠΏΠ΅Ρ Π·Π° ΡΡΠ»ΠΎΠ²ΠΈΡΠ΅ Π²ΠΎ Π ΡΠ΄Π½ΠΈΠΊΠΎΡ βΠΡΡΠΈΠΌβ ΡΠΎ ΠΏΡΠΈΠΌΠ΅Π½Π° Π½Π° ΠΌΠ΅ΡΠΎΠ΄Π°ΡΠ° Π½Π° Π΅Π΄Π½ΠΎΡΡΠ°Π²Π½ΠΈ Π°Π΄ΠΈΡΠΈΠ²Π½ΠΈ ΡΠ΅ΠΆΠΈΠ½ΠΈ. ΠΠΎ ΠΈΠ·Π±ΠΎΡΠΎΡ ΠΊΠ°ΠΊΠΎ ΠΊΡΠΈΡΠ΅ΡΠΈΡΠΌΠΈ Π·Π° ΠΎΠ΄Π»ΡΡΡΠ²Π°ΡΠ΅ ΡΠ΅ ΡΡΠ²ΠΎΠ΅Π½ΠΈ: ΡΡΠ΅Π΄Π½Π°ΡΠ° ΠΏΡΠ΅Π²Π΅Π·Π΅Π½Π° ΠΌΠ°ΡΠ° Π²ΠΎ ΡΠΈΠΊΠ»ΡΡ, ΠΊΠΎΠ΅ΡΠΈΡΠΈΠ΅Π½ΡΠΎΡ Π½Π° ΡΠ΅Ρ
Π½ΠΈΡΠΊΠ° ΠΈΡΠΏΡΠ°Π²Π½ΠΎΡΡ, ΠΊΠΎΠ΅ΡΠΈΡΠΈΠ΅Π½ΡΠΎΡ Π½Π° Π²ΡΠ΅ΠΌΠ΅Π½ΡΠΊΠΎ ΠΈΡΠΊΠΎΡΠΈΡΡΡΠ²Π°ΡΠ΅, ΡΠ°ΡΠΎΠ²Π½ΠΈΠΎΡ ΡΡΠ°Π½ΡΠΏΠΎΡΡΠ΅Π½ ΠΊΠ°ΠΏΠ°ΡΠΈΡΠ΅Ρ, Π½ΠΎΠΌΠΈΠ½Π°Π»Π½Π°ΡΠ° Π½ΠΎΡΠΈΠ²ΠΎΡΡ ΠΈ ΡΠΏΠ΅ΡΠΈΡΠΈΡΠ½Π°ΡΠ° ΠΏΠΎΡΡΠΎΡΡΠ²Π°ΡΠΊΠ° Π½Π° Π³ΠΎΡΠΈΠ²ΠΎ. Π Π°ΡΠΏΠΎΠ»ΠΎΠΆΠ»ΠΈΠ²ΠΈΡΠ΅ Π°Π»ΡΠ΅ΡΠ½Π°ΡΠΈΠ²ΠΈ Π²ΡΡΡΠ½ΠΎΡΡ ΡΠ΅ ΡΠ°ΡΠΏΠΎΠ»ΠΎΠΆΠ»ΠΈΠ²ΠΈΡΠ΅ Π΄Π°ΠΌΠΏΠ΅ΡΠΈ Π½Π° Π ΡΠ΄Π½ΠΈΠΊΠΎΡ βΠΡΡΠΈΠΌβ ΠΊΠΎΠΈ ΡΠ΅ Π²ΠΎ ΠΌΠΎΠΌΠ΅Π½ΡΠ°Π»Π½Π° ΡΠΏΠΎΡΡΠ΅Π±Π°.ΠΠ·Π±ΠΎΡΠΎΡ Π΅ ΠΈΠ·Π²ΡΡΠ΅Π½ ΠΏΠΎ Π²ΠΈΠ΄ Π½Π° Π΄Π°ΠΌΠΏΠ΅Ρ ΠΎΠ΄ Π°ΡΠΏΠ΅ΠΊΡ Π½Π° ΠΏΡΠΎΠΈΠ·Π²ΠΎΠ΄ΠΈΡΠ΅Π» ΠΈ ΡΠ΅Ρ
Π½ΠΈΡΠΊΠΈ ΠΏΠ΅ΡΡΠΎΡΠΌΠ°Π½ΡΠΈ Π½Π° ΠΈΡΡΠΈΠΎΡ
ΠΠΎΠ΄Π΅Π» Π½Π° Π²ΠΈΡΠΈΠ½ΡΠΊΠΈ ΠΊΠΎΠΏ Π½Π° ΡΡΠ΄Π½ΠΎ ΡΠ΅Π»ΠΎ Π²ΠΎ ΠΎΠ±Π»ΠΈΠΊ Π½Π° ΡΠ»ΠΎΡ ΡΠΎ ΠΏΠ°Π΄Π΅Π½ Π°Π³ΠΎΠ»
ΠΠΎ ΠΎΠ²ΠΎΡ ΡΡΡΠ΄ Π΅ ΠΏΡΠ΅Π·Π΅Π½ΡΠΈΡΠ°Π½ ΠΌΠΎΠ΄Π΅Π» Π½Π° ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈ ΠΊΠΎΠΏ Π½Π° ΡΡΠ΄Π½ΠΎ ΡΠ΅Π»ΠΎ Π²ΠΎ ΠΎΠ±Π»ΠΈΠΊ Π½Π° ΡΠ»ΠΎΡ ΡΠΎ ΠΏΠ°Π΄Π΅Π½ Π°Π³ΠΎΠ». ΠΠΎΠ΄Π΅Π»ΠΎΡ Π΅ ΡΠ°Π±ΠΎΡΠ΅Π½ ΡΠΏΠΎΡΠ΅Π΄ ΠΊΠ°ΡΠ°ΠΊΡΠ΅ΡΠΈΡΡΠΈΠΊΠΈΡΠ΅ Π½Π° ΡΡΠ΄Π½ΠΈΡΠ΅ ΡΠ΅Π»Π° Π½Π° Π½ΠΈΠΊΠ΅Π» Π²ΠΎ Π Π΅ΠΏΡΠ±Π»ΠΈΠΊΠ° ΠΠ°ΠΊΠ΅Π΄ΠΎΠ½ΠΈΡΠ°. ΠΠΏΡΠΈΠΌΠΈΠ·Π°ΡΠΈΡΠ°ΡΠ° Π΅ ΠΈΠ·Π²ΡΡΠ΅Π½Π° Π²ΠΎ ΡΡΠ½ΠΊΡΠΈΡΠ° Π½Π° ΠΌΠ°ΠΊΡΠΈΠΌΠ°Π»Π΅Π½ ΠΏΡΠΎΡΠΈΡ. ΠΠΎ Π½Π΅Π³ΠΎ ΡΠ΅ Π΄Π΅ΡΠΈΠ½ΠΈΡΠ° ΠΎΡΠ½ΠΎΠ²Π½Π°ΡΠ° Π³Π΅ΠΎΠΌΠ΅ΡΡΠΈΡΠ° Π½Π° ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈΠΎΡ ΠΊΠΎΠΏ: Π³ΠΎΠ»Π΅ΠΌΠΈΠ½Π°ΡΠ° Π½Π° Π΅ΠΊΡΠΏΠ»ΠΎΠ°ΡΠ°ΡΠΈΠΎΠ½ΠΎΡΠΎ ΠΏΠΎΠ»Π΅, Π΄Π»Π°Π±ΠΈΠ½Π°ΡΠ° (Π²ΠΈΡΠΈΠ½Π°ΡΠ°) ΠΈ Π³Π΅Π½Π΅ΡΠ°Π»Π½ΠΈΠΎΡ Π°Π³ΠΎΠ» Π½Π° ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈΠΎΡ ΠΊΠΎΠΏ
New approach ion design of a internal overburden dump in Bucim open pit in function on minimal cost of transport
With the deepening of the open pit, the transport distances for the sterile mass and the ore increased. This paper deals with the formation of an internal waste dump within the boundaries of the open pit in function on minimal cost of transport. The development of such waste dump should be in function of the space for disposing the waste according to existing situation on the field and the space for dumping. The internal waste dump will be used for permanent dumping and waste storage. Modern methods will be used to assess the slopes stability of the dump - method of lamellas, the method of Bishop, the method of Spencer and Janbu
Π‘ΡΠ°Π±ΠΈΠ»ΠΈΠ·Π°ΡΠΈΡΠ° Π½Π° ΠΊΠΎΡΠΈΠ½ΠΈΡΠ΅ Π½Π° Π΅ΡΠ°ΠΆΠΈΡΠ΅ Π½Π° ΡΡΠ΄Π½ΠΈΠΊΠΎΡ ΠΡΡΠΈΠΌ Π²ΠΎ ΡΡΠ½ΠΊΡΠΈΡΠ° Π½Π° ΠΎΠ±Π΅Π·Π±Π΅Π΄ΡΠ²Π°ΡΠ΅ Π½Π° ΡΡΠ°Π±ΠΈΠ»Π½ΠΎΡΡ Π½Π° ΠΏΡΠΈΡΡΠ°ΠΏΠ½ΠΈΡΠ΅ ΠΏΠ°ΡΠΈΡΡΠ° ΠΈ ΠΎΠ±ΡΠ΅ΠΊΡΠΎΡ Π·Π° ΠΏΡΠΈΠΌΠ°ΡΠ½ΠΎ Π΄ΡΠΎΠ±Π΅ΡΠ΅
Π’Π΅ΠΊΠΎΠ²Π½Π°ΡΠ° Π΅ΠΊΡΠΏΠ»ΠΎΠ°ΡΠ°ΡΠΈΡΠ° Π²ΠΎ ΡΡΠ΄Π½ΠΈΠΊΠΎΡ βΠΡΡΠΈΠΌβ ΡΠ΅ ΠΎΠ΄Π²ΠΈΠ²Π° Π²ΠΎ ΡΠ»ΠΎΠΆΠ΅Π½ΠΈ Π³Π΅ΠΎΡΠ΅Ρ
Π½ΠΈΡΠΊΠΈ ΡΡΠ»ΠΎΠ²ΠΈ ΡΠΎ ΠΏΠΎΡΠ°Π²ΠΈ Π½Π° ΠΎΠ΄ΡΠΎΠ½ΠΈ, ΡΠ²Π»Π΅ΡΠΈΡΡa ΠΈ ΡΠ»Π΅Π³Π½ΡΠ²Π°Ρa Π½Π° ΡΠ»ΠΎΡΠΎ. ΠΠ²Π° ΠΎΡΠΎΠ±Π΅Π½ΠΎ ΡΠ΅ ΠΌΠ°Π½ΠΈΡΠ΅ΡΡΠΈΡΠ° Π²ΠΎ ΠΏΠΎΡΠ»Π΅Π΄Π½ΠΈΡΠ΅ Π½Π΅ΠΊΠΎΠ»ΠΊΡ ΠΌΠ΅ΡΠ΅ΡΠΈ Π° Π΅ ΡΠ΅Π·ΡΠ»ΡΠ°Ρ Π½Π° ΠΏΡΠΎΠ΄Π»Π°Π±ΠΎΡΡΠ²Π°ΡΠ΅ΡΠΎ Π½Π° ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈΠΎΡ ΠΊΠΎΠΏ, Π·Π³ΠΎΠ»Π΅ΠΌΡΠ²Π°ΡΠ΅ΡΠΎ Π½Π° Π³Π΅Π½Π΅ΡΠ°Π»Π½ΠΈΠΎΡ ΡΠ°Π±ΠΎΡΠ΅Π½ ΠΈ ΠΏΡΠ΅Π΄ ΡΠ΅ Π·Π°Π²ΡΡΠ΅Π½ Π°Π³ΠΎΠ». ΠΠ²Π° ΠΊΠ»ΠΈΠ·ΠΈΡΡΠ΅ Π½Π΅ ΡΠ°ΠΌΠΎ ΡΡΠΎ ΡΠ° Π΄Π΅ΡΡΠ°Π±ΠΈΠ»ΠΈΠ·ΠΈΡΠ° Π·Π°Π²ΡΡΠ½Π°ΡΠ° ΠΊΠΎΡΠΈΠ½ΠΈΠ½Π° Π½Π° ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈΠΎΡ ΠΊΠΎΠΏ, Π³ΠΈ Π·Π°ΡΡΡΠΈ ΠΏΡΠΈΡΡΠ°ΠΏΠ½ΠΈΡΠ΅ ΠΏΠ°ΡΠΈΡΡΠ°, ΡΡΠΊΡ ΡΠΎΠ·Π΄Π°Π΄Π΅ ΠΈ ΠΏΠΎΡΠ΅Π½ΡΠΈΡΠ°Π»Π½Π° ΠΎΠΏΠ°ΡΠ½ΠΎΡΡ Π·Π° ΠΎΠ±ΡΠ΅ΠΊΡΠΎΡ Π·Π° ΠΏΡΠΈΠΌΠ°ΡΠ½ΠΎ Π΄ΡΠΎΠ±Π΅ΡΠ΅
ΠΠ½ΠΆΠ΅Π½Π΅ΡΡΠΊΠΎ-Π³Π΅ΠΎΠ»ΠΎΡΠΊΠΈ ΠΊΠ°ΡΠ°ΠΊΡΠ΅ΡΠΈΡΡΠΈΠΊΠΈ Π½Π° ΡΠ²Π»Π΅ΡΠΈΡΡΠ΅ Π½Π° ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈ ΠΊΠΎΠΏ ΠΡΠ½Π°ΡΡΠΈΠΊ Π²ΠΎ ΡΡΠ΄Π½ΠΈΠΊΠΎΡ βΠΡΡΠΈΠΌβ - Π Π°Π΄ΠΎΠ²ΠΈΡ
ΠΠΎ ΠΎΠ²ΠΎΡ ΡΡΡΠ΄ Π΅ Π½Π°ΠΏΡΠ°Π²Π΅Π½ ΠΏΡΠΈΠΊΠ°Π· Π½Π° ΠΈΠ½ΠΆΠ΅Π½Π΅ΡΡΠΊΠΎ-Π³Π΅ΠΎΠ»ΠΎΡΠΊΠΈΡΠ΅
ΠΊΠ°ΡΠ°ΠΊΡΠ΅ΡΠΈΡΡΠΈΠΊΠΈ Π½Π° ΡΠ²Π»Π΅ΡΠΈΡΡΠ΅ ΠΊΠΎΠ΅ ΡΠ΅ Π½Π°ΠΎΡΠ° Π½Π° ΠΊΡΠ°ΡΠ½ΠΈΡΠ΅ Π·Π°ΠΏΠ°Π΄Π½ΠΈ Π΄Π΅Π»ΠΎΠ²ΠΈ Π½Π°
ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈΠΎΡ ΠΊΠΎΠΏ ΠΡΠ½Π°ΡΡΠΈΠΊ Π²ΠΎ ΡΠ°ΠΌΠΊΠΈΡΠ΅ Π½Π° Π ΡΠ΄Π½ΠΈΠΊΠΎΡ βΠΡΡΠΈΠΌβ β Π Π°Π΄ΠΎΠ²ΠΈΡ.
ΠΠ΄ Π»ΠΈΡΠΎΠ»ΠΎΡΠΊΠΈ Π°ΡΠΏΠ΅ΠΊΡ ΡΡΠ°Π½ΡΠ²Π° Π·Π±ΠΎΡ Π·Π° Π°ΠΌΡΠΈΠ±ΠΎΠ»ΡΠΊΠΎ Π±ΠΈΠΎΡΠΈΡΡΠΊΠΈ ΡΠΊΡΠΈΠ»ΡΠΈ
ΠΈ Π³Π½Π°ΡΡΠ΅Π²ΠΈ, Π΄Π΅Π»ΡΠΌΠ½ΠΎ ΠΏΡΠ΅ΠΏΠΎΠΊΡΠΈΠ΅Π½ΠΈ ΡΠΎ ΠΏΠ°Π΄ΠΈΠ½ΡΠΊΠΈ ΠΌΠ°ΡΠ΅ΡΠΈΡΠ°Π»ΠΈ ΡΠΎ ΠΌΠ½ΠΎΠ³Ρ ΠΌΠ°Π»Π°
ΠΌΠΎΡΠ½ΠΎΡΡ. ΠΠΎ ΠΏΠΎΠ΄Π»Π°Π±ΠΎΠΊΠΈΡΠ΅ Π΄Π΅Π»ΠΎΠ²ΠΈ Π½Π° ΡΠ΅ΡΠ΅Π½ΠΎΡ ΡΠ΅ ΠΏΡΠΈΡΡΡΠ½ΠΈ ΡΠ²Π΅ΠΆΠΈ Π°ΠΌΡΠΈΠ±ΠΎΠ»ΡΠΊΠΎ
Π±ΠΈΠΎΡΠΈΡΡΠΊΠΈ Π³Π½Π°ΡΡΠ΅Π²ΠΈ ΡΠΎ ΠΏΠΎΠ²ΠΎΠ»Π½ΠΈ Π³Π΅ΠΎΡΠ΅Ρ
Π½ΠΈΡΠΊΠΈ ΡΠ²ΠΎΡΡΡΠ²Π°. ΠΡΠΈ ΠΈΡΡΡΠ°ΠΆΡΠ²Π°ΡΠ΅ΡΠΎ
ΠΈ ΠΈΡΠΏΠΈΡΡΠ²Π°ΡΠ΅ΡΠΎ Π½Π° ΡΠ΅ΡΠ΅Π½ΠΎΡ Π΅ ΠΏΡΠΈΠΌΠ΅Π½Π΅ΡΠ° ΡΠΎΠΎΠ΄Π²Π΅ΡΠ½Π° ΠΌΠ΅ΡΠΎΠ΄ΠΎΠ»ΠΎΠ³ΠΈΡΠ° Π½Π°
ΡΠ΅ΡΠ΅Π½ΡΠΊΠΈ ΠΈΡΡΡΠ°ΠΆΠ½ΠΈ ΡΠ°Π±ΠΎΡΠΈ ΠΈ Π»Π°Π±ΠΎΡΠ°ΡΠΎΡΠΈΡΠΊΠΈ ΠΈΡΠΏΠΈΡΡΠ²Π°ΡΠ° Π·Π° Π΄Π΅ΡΠΈΠ½ΠΈΡΠ°ΡΠ΅
Π½Π° Π³Π΅ΠΎΡΠ΅Ρ
Π½ΠΈΡΠΊΠ°ΡΠ° ΡΠΎΡΡΠΎΡΠ±Π° Π½Π° ΡΠ΅ΡΠ΅Π½ΠΎΡ Π²ΠΎ Π·ΠΎΠ½Π° Π½Π° ΡΠ²Π»Π΅ΡΠΈΡΡΠ΅ΡΠΎ. ΠΡΡΠΎ ΡΠ°ΠΊΠ°,
Π΄Π°Π΄Π΅Π½ Π΅ ΠΏΡΠΈΠΊΠ°Π· Π½Π° Π³Π΅ΠΎΠ»ΠΎΡΠΊΠΈΡΠ΅, Π³Π΅ΠΎΠΌΠ΅Ρ
Π°Π½ΠΈΡΠΊΠΈΡΠ΅ ΠΈ Ρ
ΠΈΠ΄ΡΠΎΠ³Π΅ΠΎΠ»ΠΎΡΠΊΠΈΡΠ΅ ΡΡΠ»ΠΎΠ²ΠΈ
Π½Π° ΡΠ΅ΡΠ΅Π½ΠΎΡ Π²ΠΎ Π·ΠΎΠ½Π°ΡΠ° Π½Π° ΠΏΠΎΡΡΠΎΡΠ½ΠΎΡΠΎ ΡΠ²Π»Π΅ΡΠΈΡΡΠ΅.
ΠΠ»ΡΡΠ½ΠΈ Π·Π±ΠΎΡΠΎΠ²ΠΈ: ΡΠ²Π»Π΅ΡΠΈΡΡΠ΅, ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈ ΠΊΠΎΠΏ, ΡΠΊΡΠΈΠ»ΡΠΈ ΠΈ Π³Π½Π°ΡΡΠ΅Π²ΠΈ,
Π²ΠΎΠ»ΡΠΌΠ΅Π½ΡΠΊΠ° ΡΠ΅ΠΆΠΈΠ½Π°, ΡΠ°ΠΊΠΎΡΡ Π½Π° ΡΠΌΠΎΠ»ΠΊΠ½ΡΠ²Π°ΡΠ΅
Π Π΅Π΄Π΅ΡΠΈΠ½ΠΈΡΠ°ΡΠ΅ Π½Π° Π²ΠΈΡΠΈΠ½Π°ΡΠ° Π½Π° Π½Π°Π΄Π²ΠΎΡΠ΅ΡΠ½ΠΎΡΠΎ ΠΎΠ΄Π»Π°Π³Π°Π»ΠΈΡΡΠ΅ Π²ΠΎ ΡΡΠ½ΠΊΡΠΈΡΠ° Π½Π° Π½Π΅Π³ΠΎΠ²Π°ΡΠ° Π³Π΅ΠΎΡΠ΅Ρ Π½ΠΈΡΠΊΠ° ΡΡΠ°Π±ΠΈΠ»Π½ΠΎΡΡ
Π Π°Π·Π²ΠΎΡΠΎΡ Π½Π° ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈΠΎΡ ΠΊΠΎΠΏ βΠΡΡΠΈΠΌβ Π° ΡΠΎ ΡΠΎΠ° ΠΈ Π½Π΅Π³ΠΎΠ²ΠΎΡΠΎ ΠΏΡΠΎΠ΄Π»Π°Π±ΠΎΡΡΠ²Π°ΡΠ΅ ΠΎΠ΄ Π΅Π΄Π½Π° ΡΡΡΠ°Π½Π°, ΡΠ΅ΠΊΠΎΡΠ΄Π½Π΅Π²Π½ΠΎ Π³ΠΈ Π·Π³ΠΎΠ»Π΅ΠΌΡΠ²Π° ΡΡΠ°Π½ΡΠΏΠΎΡΡΠ½ΠΈΡΠ΅ ΡΠ°ΡΡΠΎΡΠ°Π½ΠΈΡΠ° ΠΊΠ°ΠΊΠΎ Π·Π° ΠΎΠ΄Π»Π°Π³Π°ΡΠ΅ Π½Π° ΡΠ°Π»ΠΎΠ²ΠΈΠ½Π°ΡΠ° ΡΠ°ΠΊΠ° ΠΈ Π·Π° ΡΡΠ°Π½ΡΠΏΠΎΡΡΠΈΡΠ°ΡΠ΅ Π½Π° ΡΡΠ΄Π°ΡΠ° Π΄ΠΎ ΠΏΡΠΈΠ΅ΠΌΠ½ΠΈΠΎΡ ΠΏΡΠ½ΠΊΡ Π½Π° ΠΏΡΠΈΠΌΠ°ΡΠ½ΠΎΡΠΎ Π΄ΡΠΎΠ±Π΅ΡΠ΅, ΠΎΠ΄ Π΄ΡΡΠ³Π° ΡΡΡΠ°Π½Π°. ΠΠ΄Π»Π°Π»ΠΈΡΡΠ΅ΡΠΎ Π±Ρ. 1 Π·Π° Π΄Π΅ΠΏΠΎΠ½ΠΈΡΠ°ΡΠ΅ Π½Π° ΠΎΡΠΊΡΠΈΠ²ΠΊΠ°ΡΠ° ΠΎΠ΄ ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈΡΠ΅ ΠΊΠΎΠΏΠΎΠ²ΠΈ Π½Π° ΡΡΠ΄Π½ΠΈΠΊΠΎΡ βΠΡΡΠΈΠΌβ Π²Π΅ΡΠ΅ Π³ΠΈ Π½Π°Π΄ΠΌΠΈΠ½ΡΠ²Π° Π΄Π΅ΡΠΈΠ½ΠΈΡΠ°Π½ΠΈΡΠ΅ Π²ΠΈΡΠΈΠ½ΠΈ ΠΈ ΠΊΠΎΠ»ΠΈΡΠΈΠ½ΠΈ ΡΠΏΠΎΡΠ΅Π΄ ΠΏΠΎΡΡΠΎΡΠ½ΠΈΡΠ΅ Π²Π°ΠΆΠ΅ΡΠΊΠΈ ΡΡΠ΄Π°ΡΡΠΊΠΈ ΠΏΡΠΎΠ΅ΠΊΡΠΈ. ΠΡΠ΅ΡΡ
ΠΎΠ΄Π½ΠΎ Π½Π°ΠΏΠΎΠΌΠ΅Π½Π°ΡΠΈΡΠ΅ ΡΠ°ΠΊΡΠΎΡΠΈ ΡΠ° Π½Π°ΠΌΠ΅ΡΠ½ΡΠ²Π°Π°Ρ ΠΏΠΎΡΡΠ΅Π±Π°ΡΠ° ΠΎΠ΄ ΡΠ΅Π΄Π΅ΡΠΈΠ½ΠΈΡΠ°ΡΠ΅ Π½Π° ΠΏΠΎΡΡΠΎΡΠ½ΠΈΡΠ΅ ΠΊΠΎΠ½ΡΡΡΠΈ Π½Π° ΠΎΠ΄Π»Π°Π³Π°Π»ΠΈΡΡΠ΅ΡΠΎ Π±Ρ. 1 Π·Π° Π΄Π΅ΠΏΠΎΠ½ΠΈΡΠ°ΡΠ΅ Π½Π° ΠΎΡΠΊΡΠΈΠ²ΠΊΠ°ΡΠ° ΠΎΠ΄ ΠΏΠΎΠ²ΡΡΠΈΠ½ΡΠΊΠΈΡΠ΅ ΠΊΠΎΠΏΠΎΠ²ΠΈ Π½Π° ΡΡΠ΄Π½ΠΈΠΊΠΎΡ βΠΡΡΠΈΠΌβ Π²ΠΎ ΡΡΠ½ΠΊΡΠΈΡΠ° Π½Π° Π½Π΅Π³ΠΎΠ²Π°ΡΠ° Π³Π΅ΠΎΡΠ΅Ρ
Π½ΠΈΡΠΊΠ° ΡΡΠ°Π±ΠΈΠ»Π½ΠΎΡΡ
Design of an internal waste dump within the boundaries of the open pit
With the deepening of the open pit, the transport distances for the sterile mass and the ore increased. This
paper deals with the formation of an internal waste dump within the boundaries of the open pit. The
development of such waste dump should be in function of the space for disposing the waste according to
existing situation on the field and the space for dumping. The internal waste dump will be used for permanent
dumping and waste storage. Modern methods will be used to assess the slopes stability of the dump β
ordinary method, the method of Bishop, the method of Spencer and Janbu.
Key words: internal waste dump, slope stability, open pi
Analysis of the transport distances in defining the exploitation costs of depth open pits of metals
In this paper is given an analysis of the transport distances for several variants of open pits for the same ore body. The basic criterion of optimization is to minimize the costs of exploitation. The analysis gives an opportunity to define the approach for determining the optimal solution - possible surface mine