1 research outputs found

    STUDI PERENCANAAN PEMBANGUNAN PLTMH DI KAMPUNG SASNEK DISTRIK SAWIAT KABUPATEN SORONG SELATAN PROVINSI PAPUA BARAT

    No full text
    <p>Based on the results of the analysis potential PLTMH in Sasnek, then it can calculated<br> Electricity Distribution Network sourced from PLTMH Sasnek is 10 KW. The results of<br> PLTMH Development Planning Study in Sasnek Village, Sawiat District, South Sorong<br> regency of West Papua Province, are Tapping Channel Plan, Plan of Carrier Channels,<br> Container Tub Plan, Plans for Rapid Pipes And Plans for Generating Houses. The design of<br> mechanical equipment - electrical is : The turbine plan is a Turbin Crossflow T-14 D 400 with<br> turbine efficiency reaching 0.75%, axis rate 2500 rpm and axis turbine power 50 Kw moving<br> the generator with an output of 10 kW, 220 V, 50 Hz at maximum condition. The technical<br> specification plan of Sasnek PLTMH Generator is Sync AC 1 phase 220 V, 50 Hz 1500 rpm,<br> power factor 1 x 10 kW, generator capacity of 10 kW. The control and safety system plan uses<br> the Electronic Load Controller (ELC) control type. Transmission network design used Medium<br> Voltage Network (JTM) 220 Volt throughout 3000 meters. Budget estimated for the<br> construction of PLTMH Sasnek, Sawiat District of South Sorong is Rp. 2,370,046,000. This<br> Budget Plan (RAB) is calculated based on the economic condition of 2016, the data is taken<br> from Basic Price Material issued by the Government of South Sorong Regency 2016</p
    corecore