STUDI PERENCANAAN PEMBANGUNAN PLTMH DI KAMPUNG SASNEK DISTRIK SAWIAT KABUPATEN SORONG SELATAN PROVINSI PAPUA BARAT
<p>Based on the results of the analysis potential PLTMH in Sasnek, then it can calculated<br>
Electricity Distribution Network sourced from PLTMH Sasnek is 10 KW. The results of<br>
PLTMH Development Planning Study in Sasnek Village, Sawiat District, South Sorong<br>
regency of West Papua Province, are Tapping Channel Plan, Plan of Carrier Channels,<br>
Container Tub Plan, Plans for Rapid Pipes And Plans for Generating Houses. The design of<br>
mechanical equipment - electrical is : The turbine plan is a Turbin Crossflow T-14 D 400 with<br>
turbine efficiency reaching 0.75%, axis rate 2500 rpm and axis turbine power 50 Kw moving<br>
the generator with an output of 10 kW, 220 V, 50 Hz at maximum condition. The technical<br>
specification plan of Sasnek PLTMH Generator is Sync AC 1 phase 220 V, 50 Hz 1500 rpm,<br>
power factor 1 x 10 kW, generator capacity of 10 kW. The control and safety system plan uses<br>
the Electronic Load Controller (ELC) control type. Transmission network design used Medium<br>
Voltage Network (JTM) 220 Volt throughout 3000 meters. Budget estimated for the<br>
construction of PLTMH Sasnek, Sawiat District of South Sorong is Rp. 2,370,046,000. This<br>
Budget Plan (RAB) is calculated based on the economic condition of 2016, the data is taken<br>
from Basic Price Material issued by the Government of South Sorong Regency 2016</p