2 research outputs found

    Penerapan Ekohidraulik pada Hulu Sub DAS Bompon, Kabupaten Magelang, Jawa Tengah

    Get PDF
    The upstream of Bompon sub-watershed is located in Magelang Regency, Central Java. The movement of soil mass and erosion often happens at Bompon sub-watershed. The occurrence of erosion is caused by high runoff so the soil and rocks become eroded and the loose material will enter the river body. The purpose of this study is to determine the characteristics and application of eco-hydraulics in the Upper Bompon watershed. The methods used include survey, mapping methods and mathematical methods. Preparation stage were done by collecting secondary data which were used as the basis for field data collection. The field work phase include collecting primary data by crosschecking and mapping. Furthermore, measuring river flow and observing the name of the flora. The results of the study showed that the width of the river was 1.1 m, the same as rice field irrigation channel with the pattern of dendritic drainage. The highest river flow discharge was 0.043 m3/s that occur in January, while the lowest was in June with river discharge of 0.010 m3/s. Eco-hydraulic application uses cliff restraint methods, namely cliff planting, cliff cover, cliff plants, flat fences and the use of gulud terraces. Keywords: River Flow Discharge, Ecohydraulic, Erosion, Upstream

    Karakteristik Sedimen Melayang dan Sedimen Dasar pada Sungai Bompon, Sub DAS Bompon, Kabupaten Magelang, Jawa Tengah

    No full text
    Proses geomorfologi seperti erosi dan longsor sangat aktif terjadi di Sub DAS Bompon yang berada di Kabupaten Magelang, Jawa Tengah. Material yang tererosi tersebut tersedimentasi di Sungai Bompon. Material sedimen yang berada pada Sungai Bompon berasal dari tanah permukaan yang tererosi, erosi tebing sungai, dan erosi dasar sungai. Karakteristik sedimen yang berada di Sungai Bompon perlu diketahui guna mengetahui upaya pengelolaan daerah aliran sungai terpadu. Tujuan penelitian ini untuk menganalisis karakteristik sedimen melayang dan sedimen dasar pada sungai Bompon pada bagian hulu, tengah dan hilir. Metode yang digunakan dalam penelitian ini yaitu metode survei, metode pemetaan, metode analisis laboratorium dan metode matematis. Hasil penelitian menunjukan bahwa debit muatan sedimen melayang pada bagian hulu sungai rata-rata sebesar 55,322 ton/tahun dengan hubungan antara debit aliran dan debit muatan sedimen melayang yang dirumuskan dalam Qs = 9,12119 Q -0,12828 dengan r (korelasi) = 0,9768. Debit muatan sedimen dasar pada hulu sungai rata-rata sebesar 0,323 ton/tahun. Pada bagian tengah sungai, debit muatan sedimen melayang memiliki rata-rata sebesar 945,570 ton/tahun dengan hubungan antara debit aliran dan debit muatan sedimen melayang dapat dirumuskan dalam Qs = 23,9113 Q -0,58204 dengan r (korelasi) = 0,98178. Debit muatan sedimen dasar pada bagian tengah sungai rata-rata sebesar 2,077 ton/tahun. Pada bagian hilir sungai, debit muatan sedimen melayang memiliki rata-rata sebesar 8297,002 ton/tahundengan hubungan antara debit aliran dan debit muatan sedimen melayang dapat dirumuskan dalam Qs = 42,3715 Q -1,14840 dengan r (korelasi) = 0,95373 dan debit muatan sedimen dasar yang dihasilkan rata-rata sebesar 5,975 ton/tahun
    corecore