13 research outputs found
Minimizing the Weighted Number of Late Semi-resumable Jobs with Deterministic Machine Availability Constraints
Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study
An improved algorithm for the two machine flow shop problem with several availability constraints
Efficient Approximation Schemes for the Maximum Lateness Minimization on a Single Machine with a Fixed Operator or Machine Non-Availability Interval
Efficient approximation schemes for the maximum lateness minimization on a single machine with a fixed operator or machine non-availability interval
Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
Two-agent scheduling with agent specific batches on an unbounded serial batching machine
International audienc
The symmetric quadratic knapsack problem: approximation and scheduling applications
This paper reviews two problems of Boolean non-linear programming: the Symmetric Quadratic Knapsack Problem and the Half-Product Problem. The problems are related since they have a similar quadratic non-separable objective function. For these problems, we focus on the development of fully polynomial-time approximation schemes, especially of those with strongly polynomial time, and on their applications to various scheduling problems