18 research outputs found

    Analysis on characteristic of DC short-circuit fault in multi-terminal AC/DC hybrid distribution network

    No full text
    The AC/DC hybrid distribution network takes advantage of both AC and DC technologies. It is one of the most important forms of future distribution systems. However, currently few work has been done on the topology determination of this network, and its fault behaviour of DC short-circuit fault has not been clearly investigated yet. First, the tree, radial, and ring topologies of a three-terminal AC/DC distribution network are compared. Also the characteristics of fault currents in DC circuit breakers during a DC short-circuit fault are analysed in detail. Then the equivalent circuit models during the fault are established and accurate mathematical expressions of transient fault currents are deduced. Based on this, the influence of network topologies on the characteristics of fault currents is investigated thoroughly. Moreover, a method to determine the peak values and peak times of fault currents is presented which can simplify the selection of circuit components. The simulation results show that the fault currents of the radial topology have the lowest peak values and longest peak times, and the proposed method meets the requirements of both simplicity and accuracy. Finally, the influence of the key parameters on the proposed method is investigated comprehensively

    Equity assessment of the distribution of CT and MRI scanners in China: a panel data analysis

    No full text
    Abstract Background Distribution equity assessment of computed tomography (CT) and magnetic resonance imaging (MRI) scanners is an important dimension of access to health technology. However, limited studies on the subject have been done in China. This study aims to reveal the distribution status of CT and MRI scanners and assess their distribution equity of them in China. Methods Five provinces with 66 cities from China were selected as the study sites. Descriptive analysis was used for the absolute number and number per million population of CT and MRI scanners in the study sites. Fixed effect model was used to examine the health service factors that were associated with the allocation of CT and MRI scanners. The Gini coefficient and concentration index was used to evaluate the distribution equity of CT and MRI scanners. Results The absolute number and number per million population of CT and MRI scanners in five provinces were lower than those of Organization for Economic Co-operation and Development (OECD) countries, but annual growth rates were relatively higher from 2005 or 2006 to 2013. Population, GDP, number of hospitals, number of health professionals, number of hospital beds, number of outpatient visits, and number of inpatient visits all had a positive correlation with the allocation number of CT and MRI scanners. Moreover, the number of health professionals and the number of beds had a much closer correlation than other variables. All the Gini coefficients of CT and MRI had decreased overall. The concentration indices of CT and MRI were all positive and no more than 0.30. Conclusions Large gaps in the number of CT and MRI scanners per million population between China and OECD countries emerge, although the growth rate is higher in China. The distribution equity of CT and MRI scanners in China was relatively good from 2005 or 2006 to 2013. The overall distribution equity of CT and MRI scanners also improved during the period. However, consideration attention should be given to the area with large economic disparities

    CEPC Technical Design Report -- Accelerator

    No full text
    The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore