96 research outputs found
Recommended from our members
Identifying environmental safety and health requirements for the Fernald Environmental Restoration Management Corporation
This presentation will describe the Fernald Environmental Restoration Management Corporation`s (FERMCO) Standards/Requirements Identification Documents (S/RlDs) Program, the unique process used to implement it, and the status of the program. We will also discuss the lessons learned as the program was implemented. The Department of Energy (DOE) established the Fernald site to produce uranium metals for the nation`s defense programs in 1953. In 1989, DOE suspended production and, in 1991, the mission of the site was formally changed to one of environmental cleanup and restoration. The site was renamed the Fernald Environmental Management Project (FEMP). FERMCO`s mission is to provide safe, early, and least-cost final clean-up of the site in compliance with all regulations and commitments. DOE has managed nuclear facilities primarily through its oversight of Management and Operating contractors. Comprehensive nuclear industry standards were absent when most DOE sites were first established, Management and Operating contractors had to apply existing non-nuclear industry standards and, in many cases, formulate new technical standards. Because it was satisfied with the operation of its facilities, DOE did not incorporate modern practices and standards as they became available. In March 1990, the Defense Nuclear Facilities Safety Board issued Recommendation 90-2, which called for DOE to identify relevant standards and requirements, conduct adequacy assessments of requirements in protecting environmental, public, and worker health and safety, and determine the extent to which the requirements are being implemented. The Environmental Restoration and Waste Management Office of DOE embraced the recommendation for facilities under its control. Strict accountability requirements made it essential that FERMCO and DOE clearly identify applicable requirements necessary, determine the requirements` adequacy, and assess FERMCO`s level of compliance
A Comprehensive Profile of Decoding and Comprehension in Autism Spectrum Disorders
The present study examined intake data from 384 participants with autism spectrum disorders (ASD) and a comparison group of 100 participants with dyslexia on nine standardized measures of decoding and comprehension. Although diagnostic groups were based on parental reports and could not be verified independently, we were able to observe significant distinctions between subject groups. Overall findings confirm previous results of a disassociation between decoding and comprehension in ASD. Using a larger sample than previous studies and a greater variety of measures, a pattern of relatively intact decoding skills paired with low comprehension was found in autism, PDD-NOS, and Asperger’s. In contrast, the dyslexic group showed the opposite pattern of stronger comprehension and weaker decoding
Recommended from our members
Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor
The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor`s (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor`s management plan
- …