    PSS/E based placement wind/PV hybrid system to improve stability of Iraqi grid

    Get PDF
    Proper employment of Hybrid Wind/ PV system is often implemented near the load, and it is linked with the grid to study dynamic stability analysis. Generally, instability is because of sudden load demand variant and variant in renewable sources generation. As well as, weather variation creates several factors that affect the operation of the integrated hybrid system. So this paper introduces output result of a PV /wind via power electronic technique; DC chopper; that is linked to Iraqi power system to promote the facilitating achievement of Wind/ PV voltage. Moreover, PSS/E is used to study dynamic power stability for hybrid system which is attached to an effective region of Iraqi Network. The hybrid system is connected to Amara Old bus and fault bus is achieved to that bus and the stability results reflects that settling time after disturbance is not satisfactory. But, it is found that PV/wind generation system influences Iraqi grid stability to be better than that with only PV generation and the latter is better than stability of the grid that is enhanced with only wind generation. These results represent an important guideline for Iraqi power system planner

    C. B interrupt duty reduction based controlling TRV and symmetrical breaking current

    No full text
    AbstractEvaluating the rated MVA sizes of the Circuit Breaker (CB) requires calculating reactance parameters from fault analysis and synchronizing these parameters with the reference re- striking voltage. In this paper two ways are used in controlling X/R ratio of the system to reduce CB size in order to save cost on system configuration. PSS/E program was introduced to facilitate and illustrate the solution. X/R ratio and subtransient reactance were calculated to provide an approach to assess the current and duty interruption of generator buses with contributions from all other buses. The effect of reduction factors and NACD for the symmetrical component of the short circuit current is also applied in our proposed method. The obtained results proved that applying the reduction factor technique in New England system reduces the rated interruptions of C.Bs, and CB rate is also minimized in Bismayah132kV power plant from Iraqi grid utilizing effective switching which economizes choosing CB. It is concluded that the two techniques can be used successfully for designing CB ratings with a minimum cost
    corecore