9 research outputs found

    SARAF-Phase 2 Low-Beta and High-Beta Superconducting Cavities Qualification

    No full text
    International audienceCEA is committed to delivering a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5 mA beam of either protons from 1.3 MeV to 35 MeV or deuterons from 2.6 MeV to 40 MeV. The SCL consists in four cryomodules. The first two identical cryomodules host 6 half-wave resonator (HWR) low beta cavities (β= 0.09) at 176 MHz. The last two identical cryomodules will host 7 HWR high-beta cavities (β = 0.18) at 176 MHz. The low-beta prototypes was qualified in 2019. Low-beta series manufacturing is on-going. The high-beta prototype was first tested in 2019 but failed. A new prototype was tested in the end of 2020. This contribution will present the results of the tests for low- and high-beta SARAF cavities, series and prototypes

    Final Design of the LB650 Cryomodule for the PIP-II Linear Accelerator

    No full text
    International audienceThe Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and its scope covers the supply of the 650 MHz low-beta cryomodule section, with the design of the cryostat (i.e the cryomodule without the cavities, the power couplers and the frequency tuning systems) and the manufacturing of its components, the assembly and tests of the pre-production cryomodule and 9 production modules. An important milestone was reached in April 2023 with the Final Design Review. This paper presents the detailed design of the 650 MHz low-beta cryomodules

    Results of CEA Tests of SARAF Cavities Prototypes

    No full text
    International audienceCEA is committed to delivering a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5mA beam of either protons to 35 MeV or deuterons to 40 MeV. The SCL consists in 4 cryomodules. The first two cryomodules host 6 & 7 half-wave resonator (HWR) low beta cavities (β = 0.09) at 176 MHz, and the last two crymodules host 7 HWR medium beta cavities (β = 0.18). The low beta prototype was qualified, the medium beta is being qualified. The results of the RF tests will be presented in this poster

    Results of CEA Tests of SARAF Couplers Prototypes

    No full text
    International audienceCEA is committed to delivering a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5 mA beam of either protons from 1.3 MeV to 35 MeV or deuterons from 2.6 MeV to 40 MeV. The SCL consists in 4 cryomodules. The first two cryomodules host 6 and 7 half-wave resonator (HWR) low beta cavities (β = 0.09) at 176 MHz. The last two identical cryomodule will host 7 HWR high-beta cavities (β = 0.18) at 176 MHz. The maximal required power to be transmitted to the beam is 11.4 kW for high-beta cavity couplers. This document presents the results of the coupler tests and conditioning

    CEA Contribution to the PIP-II Linear Accelerator

    No full text
    International audienceThe Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018 and will deliver 10 low-beta cryomodules as In-Kind Contributions to the PIP-II project, with cavities supplied by LASA-INFN (Italy) and VECC-DAE (India), and power couplers and tuning systems supplied by Fermilab. An important milestone was reached in March 2023 with the Final Design Review of the cryomodule, launching the pre-production phase. This paper presents the status CEA activities on the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements

    CEA Contribution to the PIP-II Linear Accelerator

    No full text
    International audienceThe Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and will deliver 10 low-beta cryomodules as In-Kind Contribution to the PIP-II project, with cavities supplied by LASA-INFN and power couplers and tuning systems supplied by Fermilab. This paper presents the CEA scope of work that includes the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements

    Commissioning of New SARAF RFQ and Design of New Linac

    No full text
    International audienceSoreq Nuclear Research Center (SNRC) and CEA collaborate for the upgrade of the existing Soreq Applied Research Accelerator Facility (SARAF) accelerator up to 5mA Continuous Wave (CW) 40 MeV deuteron and proton beams (Phase 2). SNRC is upgrading the injector: the ion source, the low energy beam transport line and the 4-rods Radio Frequency Quadrupole (RFQ). CEA is in charge of the development and commissioning of the medium energy beam transport line and the superconducting linac. This paper presents the status of the SARAF linac development by CEA and the installation and testing of a new set of rods electrodes in the SARAF RFQ

    RF Power Test of the Rebuncher for Saraf-Linac

    No full text
    International audienceThree normal conducting rebunchers will be installed at the Medium Energy Beam Transport (MEBT) of the SARAF-LINAC phase II [saraf]. The MEBT line is designed to follow a 1.3 MeV/u RFQ, is about 5 m long, and contains three 176 MHz rebunchers providing a field integral of 10⁵ kV. CEA is in charge of the design and fabrication of the Cu plated stainless steel, 3-gap rebuncher. The high power tests and RF conditioning have been successfully performed at the CEA Saclay on the first cavity. A solid state power amplifier, which has been developed by SNRC and has been used for the RF tests. The cavity has shown a good performance according to calculations, regarding the dissipated power, peak temperatures and coupling factor. RF conditioning was started with a duty cycle of 1\% and increased gradually until continuous wave (CW), which is the nominal working mode in SARAF-LINAC

    Study and test of the rebuncher for SARAF-LINAC phase II

    No full text
    International audienceIn order to match the beam exiting the RFQ to the superconducting cavities and to minimize the longitudinal beam extension, three rebunchers will be installed in the Medium Energy Beam Transport (MEBT) of SARAF-LINAC phase II. CEA is in charge of the design and fabrication of the copper-plated stainless steel, 3-gap rebunchers. Beam dynamic simulation leads to the global MEBT design. The rebuncher was successfully conditioned to the RF power of 4.4 kW required for CW operation, with sufficient power margin. A solid state power amplifier of 10 kW developed by SNRC is used during the RF test. The rebuncher shows a good performance in terms of the dissipated power, peak temperatures and vacuum level
    corecore