5 research outputs found

    Prioritization of energy retrofit strategies in public housing: An AHP model

    No full text
    The design and implementation of buildings energy retrofit strategies is a complex process involving a great number of decision variables and actors, especially when public housing is concerned. This complexity is exacerbated by stringent public budget constraints and lack of financial resources that make public housing energy retrofit currently a critical issue in Italy. In this context, multiple objectives related to energy saving, thermal comfort and conservation compatibility need to be pursued and multiple criteria approaches provide a proper theoretical and methodological framework to address economic, technical, social and environmental issues that characterize investments in energy saving and retrofit strategies. In this paper, we analyze different energy efficiency measures to be implemented in public housing and we propose an AHP (relative) model for multi-criteria prioritization of energy-retrofit strategies on public-housing existing stock

    Biogas and Biomethane Technologies: an AHP Model to Support the Policy Maker in Incentive Design in Italy

    No full text
    Over the past six years, biogas production in Italy has experienced an economic boom: more than 4.5 billion euro investments, about 2 billion normal cubic meters of natural gas equivalent produced. By contrast, biomethane production in Italy is not widespread. This limited spread substantially depends on the lack of profitable Government incentives to biomethane production. In the near future, the Italian Government is expected to fix new feed-in tariff (FIT) schemes for energy production by renewable energy sources (RES). In this context it is fundamental for the policy maker to identify whether it will be preferable to introduce more generous FITs to favor biogas production for electric power generation vs biomethane production through biogas upgrading. In this paper we propose a multi criteria decision model to support the policy maker in the definition of sustainable development policies for biogas and biomethane production. Specifically we provide an Analytic Hierarchy Process (AHP) model to multiple criteria prioritization of incentives paid to biogas vs biomethane. According to group decision making approaches, we selected a pool of experts that structured the decision problem and disaggregated it into a hierarchy by identifying quantitative and qualitative criteria and subcriteria to evaluate each technology. The model results reveal that biomethane production plants are preferred to biogas production plants independently from the size, whereas bigger size biomethane installations are ranked higher with respect to smaller ones. Under stringent public budget constraints it might be de facto inefficient and not cost-effective to introduce incentive mechanisms to biogas production plant
    corecore