2 research outputs found

    RELIABILITY BASED PERFORMANCE ASSESSMENT ON MECHANICAL MAIN SYSTEM USING RELIABILITY AVAILABILITY MAINTAINABILITY (RAM) ANALYSIS METHOD AND BLOCKSIM 9.0 AT PT. PERTAMINA GEOTHERMAL ENERGY KAMOJANG

    Get PDF
    ABSTRAKSI: In the daily life, electricity is a vital thing and something that never released from human activity. Pertamina Geothermal Energy (PGE) is a subsidiary company of PT. Pertamina (Persero) established since 2006 which utilize geothermal resources to generate electricity in Indonesia. PT. PGE Kamojang is the first geothermal field which was inaugurated on January 29th 1983. Total generating capacity of Kamojang Power Plant is 200MW consist of Unit 1, 2, 3 with total of 140MW and 60MW from Unit 4. In Power Plant, there are seven Mechanical Main System which is have important role. The seven system are, Steam Separating System (LBJ), Steam Supply and Venting System (LB), Steam Turbine and Lube Oil System (MA), Steam Return System (MAG), Gas Removal System (MAJ), Circualtiong Cooling Water System (PA), and Raw Water System (GA). When the seven system is being operated and there is a system fail, then Power Plant cannot be operated. The failure that can occur in the system can be avoided by doing research using RAM Analysis Method and Blocksim 9.0 software. Because with RAM Analysis Method and simulation through Blocksim 9.0 software, the Availability, Reliability, and Maaintainability of a system will be known. The last results of this research is also to determine the Critical Equipment in Mechanical Main System. From this research which is use the RAM Analysis Method and Blocksim 9.0 software, can be seen the Availability of Power Plant is 73,8675% and the Reliability is 68,7% for one month interval and 0,8% for one year (12 months) interval. For the critical equipment if it is based on RS FCI then the critical equipment are PA-BF207 with RS FCI 13,08%, PA-BF109 with RS FCI 12,99%, PA-BF110 with RS FCI 12,21%, MA-STRB with RS FCI 10,26%, MAG-CND with RS FCI 6,51%, MA-GEN with RS FCI 5,03%, and LBJ-SCR with RS FCI 4,04%. For the critical equipment when it is based on RS DTCI then the critical equipmetn are MA-STRB with RS DTCI 21,16%, MA-GEN with RS DTCI 11,98%, MA-BRX with RS DTCI 6,48%, MA-TRG with RS DTCI 5,55%, MA- GBR02 with RS DTCI 5,23%, MA-MTG with RS DTCI 5,05%, and MA-TBR02 with RS DTCI 5,05%. KATA KUNCI: Reliability, Availability, Maintainability, Reliability Block Diagram (RBD), Failure Mode and Effect Analysis (FMEA), Equipment Configuration, Power PlantABSTRACT: In the daily life, electricity is a vital thing and something that never released from human activity. Pertamina Geothermal Energy (PGE) is a subsidiary company of PT. Pertamina (Persero) established since 2006 which utilize geothermal resources to generate electricity in Indonesia. PT. PGE Kamojang is the first geothermal field which was inaugurated on January 29th 1983. Total generating capacity of Kamojang Power Plant is 200MW consist of Unit 1, 2, 3 with total of 140MW and 60MW from Unit 4. In Power Plant, there are seven Mechanical Main System which is have important role. The seven system are, Steam Separating System (LBJ), Steam Supply and Venting System (LB), Steam Turbine and Lube Oil System (MA), Steam Return System (MAG), Gas Removal System (MAJ), Circualtiong Cooling Water System (PA), and Raw Water System (GA). When the seven system is being operated and there is a system fail, then Power Plant cannot be operated. The failure that can occur in the system can be avoided by doing research using RAM Analysis Method and Blocksim 9.0 software. Because with RAM Analysis Method and simulation through Blocksim 9.0 software, the Availability, Reliability, and Maaintainability of a system will be known. The last results of this research is also to determine the Critical Equipment in Mechanical Main System. From this research which is use the RAM Analysis Method and Blocksim 9.0 software, can be seen the Availability of Power Plant is 73,8675% and the Reliability is 68,7% for one month interval and 0,8% for one year (12 months) interval. For the critical equipment if it is based on RS FCI then the critical equipment are PA-BF207 with RS FCI 13,08%, PA-BF109 with RS FCI 12,99%, PA-BF110 with RS FCI 12,21%, MA-STRB with RS FCI 10,26%, MAG-CND with RS FCI 6,51%, MA-GEN with RS FCI 5,03%, and LBJ-SCR with RS FCI 4,04%. For the critical equipment when it is based on RS DTCI then the critical equipmetn are MA-STRB with RS DTCI 21,16%, MA-GEN with RS DTCI 11,98%, MA-BRX with RS DTCI 6,48%, MA-TRG with RS DTCI 5,55%, MA- GBR02 with RS DTCI 5,23%, MA-MTG with RS DTCI 5,05%, and MA-TBR02 with RS DTCI 5,05%. KEYWORD: Reliability, Availability, Maintainability, Reliability Block Diagram (RBD), Failure Mode and Effect Analysis (FMEA), Equipment Configuration, Power Plan

    PENERAPAN STORY TELLING DAN INSTAGRAM: OPTIMALISASI LAYANAN PERPUSTAKAAN KELILING DI DINAS KEARSIPAN DAN PERPUSTAKAAN KABUPATEN KEDIRI

    Get PDF
    The application of story telling in the Mobile Library of the Archives and Library Service (Disarpus) of Kediri Regency was conducted from February 2018 – March 2018 which was divided into four cycles. Each cycle consists of two meetings. At each meeting, researchers used the same story, namely stories of fables and different in each cycle with an increase of approximately two to five children per-cycle. To promote of the mobile library services, the instition used Instagram. The research results showed that the Archives and Library Service (Disarpus) of Kediri Regency has exceeded the target achievement of Instagram as a promotional media, in its application it is divided into five cycles, each cycle carried out for one week. Instagram promotions are conducted to the first cycle to the fifth cycle there is an increase from 116 to 200 followers; the achievement of likes to occur from cycle I – cycle III, from 372 to 798 likes while from cycle III until V there is not change
    corecore